说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 景电灌区
1)  Jingtai electrical irrigation area
景电灌区
1.
Landscape pattern change of the new oasis in the Jingtai electrical irrigation area;
景电灌区新绿洲景观格局分析
2)  Jingdian irrigation area
甘肃景电灌区
1.
Properties and genetic mechanisms of the secondary salinized soils in Jingdian irrigation area of Gansu Province;
甘肃景电灌区次生盐化土壤的性质及其发生机理
3)  Jingtai Irrigation District
景泰灌区
1.
The Analysis of Water Environment Changes Over the Past 30 Years in the CaoWoTan Basin of Jingtai Irrigation District;
景泰灌区草窝滩盆地30年以来水环境变化分析
4)  Xingdian irrigation district
兴电灌区
1.
Discussion and practice of IT system establishment in Xingdian irrigation district;
兴电灌区信息化建设探讨与实践
2.
The feature of the nutrient cycle and balance of the six primary strip lands were studied by investigating the input and output nutrients of the six patterns in Xingdian irrigation district.
以兴电灌区6种主要带田种植模式为对象,采用田间实地调查,在典型地块划定小区按籽粒、秸秆和根茬三部分测重并取样分析化验的方法,研究了各模式的养分输入与输出状况及其养分循环与平衡特征。
5)  pumping district
机电灌区
6)  Jingtai Electric Power's Pumping Irrigation
景泰电力提灌工程
补充资料:厂用电受电


厂用电受电
energizing of auxiliary power system

chongyongd一on sho一Jd一on厂用电受电(energizing of auxiliary powersystem)机组附属设备安装完毕后需通电试运行,所需厂用电源由外部供给,因此厂用电受电是调试工作开始的标志。 受电步骤新建电厂先由电力系统向变电站供电,再依次对高压起动/备用变压器、3~10kv厂用配电装置、厂用工作变压器及380V配电装置供电。扩建电厂因高压起动/备用变压器已经投人运行,故可利用它的电源对扩建的厂用配电装置等供电。 调试项目主要有:①用额定电压依次对空载线路、变电站母线、隔离开关、断瘩器、互感器、变压器及厂用配电装置等进行冲击合闸试验。有条件时.冲击合闸前应先进行递升加压试验。升压过程中注意检查各设备有无放电声及短路现象,发现问题及时处理后再进行升压。②检查三相电压应平衡,相序应正确,各段母线的相位彼此应一致。对配电装置供电时,有时会由于母线电容和与母线连接的电磁式电压互感器的电感相互作用而出现铁磁谐振,此时相电压升高,中性点明显位移。为消除谐振可在电压互感器的剩余电压绕组处并联电阻以去振。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条