说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 最大库容量
1)  Peak sink
最大库容量
2)  ultimate reservoir capacity
最大储库容量
3)  maximum capacity
最大容量
1.
Determination of the maximum capacity of power generator for Jilintai First-cascade Hydropower Station;
吉林台一级水电站发电机最大容量设置
2.
In view of the large head variation in Longtan hydropower station and the turbine′s operation stability,this paper gives suggestion to raise the rated head of turbine or set a maximum capacity of generator of continuous operation .
由于龙滩电站水头变幅较大 ,考虑水轮机运行稳定性 ,建议提高水轮机额定水头或设置可连续运行的发电机最大容量。
3.
According to the requirements of the international bidding for the generating units of Ertan Hydropower Station,the selection and verification of the main parameters and structural types (such as rated power factor,maximum capacity,temperature rise limit,rated voltage,cooling way,braking type,short circuit ratio,reactance value,the position of thrust bearing,etc.
由于二滩水电站机组国际招标的需要,通过专题研究和对外技术交流,对二滩水轮发电机的主要参数和结构型式,如额定功率因数、最大容量和温升限值、额定电压、冷却方式、制动方式、短路比和X′d、X″d电抗值、推力轴承的位置等,进行了选择和论证,作为标书编制和合同谈判的依据。
4)  maximum inventory
最大库存量
5)  Capacity Maximization
容量最大化
6)  the maximum capacity path
最大容量路
1.
An algorithm with polynomial complexity O(n 3) is produced in this article,for seeking the maximum capacity paths between arbitrary two nodes in the transportation network.
给出了一个求运输网络中任意两顶点间最大容量路的多项式算法X2,证明了算法的正确性,分析了算法的复杂性为O(n3)。
补充资料:肾小管葡萄糖最大重吸收量试验


肾小管葡萄糖最大重吸收量试验


  一种测定肾小管重吸收功能的试验。利用单位时间内肾小球滤出的葡萄糖量减去单位时间尿中出现的葡萄糖量,可计算出TMG值。测定方法:晨7时30分首次静脉注射40%葡萄糖溶液150ml,以后用30%葡萄糖溶液每分钟10ml速度维持输液。其他操作同*菊糖清除率,同时测定菊糖清除率以求出肾小球滤过率,然后按下式计算TMG值。TMG=PG×Cin-UG×V,式中PG为血浆葡萄糖浓度,Cin为菊糖清除率,UG为尿中葡萄糖浓度,V为每分钟尿量。正常人TMG平均值为340± 18.2mg/min/1.73m2。男性为300~450mg/min/1.73m2,女性约250~350mg/min/1.73m2。TMG的高低可反映有效肾单位的数量和功能,是测定近曲肾小管重吸收功能的指标之一。
  
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条