1.
Due to the rigorous time limit of drain tunnel in Jinping-II Hydropower Project,compact plane layout that can satisfy the requirements of quick TBM assemble is designed for the TBM assemble cavern,minimal cross-section that can satisfy the assemble is designed,reinforcement pattern consisting of rock bolts,shotcreting and wire meshing is designed.
锦屏二级水电站排水洞施工工期紧张,TBM组装洞在平面布置上充分利用已有的钻爆洞段,在满足快速安装转运的最小长度的前提下尽量紧凑布置;在断面设计上,最小断面尺寸以满足起重安装为原则,尽量减小开挖工程量;在支护设计上结合围岩特性采用少占直线工期的锚喷网联合支护型式。