说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 耕地生产潜能
1)  Productive potential of cultivated land
耕地生产潜能
2)  cultivated land potential production
耕地生产潜力
1.
The results show that the quantity difference between cultivated land productivity estimated by the model and grain output is 10%,while cultivated land potential production is 30% higher than the present yield.
采用传统的潜力递减法模型,在GIS空间建模技术支持下,分别计算光合生产潜力、光温生产潜力、气候生产潜力和耕地生产潜力。
3)  productivity of cultivated land
耕地生产能力
1.
This paper analyzes the demand of food in the next 30 years, the trend of non-agricultural utilization of cultivated land, actuality of cultivated land quality, portent of productivity of cultivated land in China and the quantity of food export in world market.
因此保障未来三十年我国粮食安全的根本途径是提高耕地质量和增强耕地生产能力。
4)  construction potential of plantation-foodstuff
耕地粮食生产潜力
5)  Thornthwaite-Memorial Model
耕地自然生产潜力
1.
Then the cultivated land potential productivity(CLPP) and its variation feature were obtained and analyzed with the Thornthwaite-Memorial Model by using land use and land change data derived from Landsat TM data in 1990,1995 and 2000.
气候和土地利用变化通过不同的方式影响耕地的自然生产潜力,目前在时空尺度上定量分析典型生态边缘区气候干旱和土地利用变化对耕地自然生产潜力综合影响的研究还比较薄弱。
6)  grain productive capacity
耕地粮食生产能力
补充资料:JIT准时制生产(及时制生产)

JIT准时制生产(及时制生产):是应用拉引式生产物流控制原理的方法。在生产系统中任何两个相邻工序即上下工序之间都是供需关系,如何处理这种关系,就是生产物流所要研究的问题。按照传统的生产计划组织生产(包括MRP),物料根据预定的计划时间由供方向需方逐个工序流动。需求方根据上一工序送来物料的数量和到达时间进一步加工。需求方接受物料完全是被动的,如果出现不可预料的因素,物料可能提前或延迟到达。延迟到达将使生产中断,必须在生产计划中留有余地,以避免这种现象的发生。这样一来,必然存在或多或少、提前到达的现象,从而导致系统中库存量的上升,产生种种库存多余的弊病。JIT的方法改变了传统的思路,由需方起主导作用,需方决定供应物料的品种、数量、到达时间和地点。供方只能按需方的指令(一般用看板)供应物料。送到的物料必须保证质量,无残次品。这种思想就是以需定供,可以大大提高工作效率与经济效益。

说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条