说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 广东LNG站线项目
1)  LNG station-pipeline project of Guangdong Province
广东LNG站线项目
2)  LNG project
LNG项目
1.
Customer Development is the Key Element to Guarantee the Smooth Implementation of LNG Project in Shenzhen;
用户拓展是保障深圳市LNG项目顺利实施的关键因素
2.
With the practical example in Guangdong LNG project,several insulation materials were comprehensively analyzed.
结合广东LNG项目的实例,综合分析了几种隔热材料的性能,从中进行选择,进而确定隔热结构,为同类型工程项目的隔热设计工作提供了参考。
3)  Guangdong Dapeng LNG receiving terminal
广东大鹏LNG接收终端
1.
The overall design and system optimization of Guangdong Dapeng LNG receiving terminal;
广东大鹏LNG接收终端总体设计及主要系统工艺优化
4)  Dongzhan square
东站广场
1.
This paper introduces the development process of city square,classifies and discusses the squares in Guangzhou according to the status of squares in city and the differences of applying functions,mainly compares Dongzhan square and Renmin square,and draws some meaningful conclusions for references.
介绍了城市广场的发展历程,根据广场在城市中的地位和使用功能的不同,对广州广场进行了分类,并对它们进行了探究,着重对东站广场和人民广场进行了比较,得出了一些有意义的结论,可供参考。
5)  west station
西站站项目
6)  project web site
项目网站
补充资料:站线
      在铁路车站范围内,除正线以外的其他铁路线路的统称。主要包括:①到达线,供办理列车到达作业使用的线路;②出发线,供办理列车发车作业使用的线路;③到发线,兼有到达线和出发线的功能的线路;④调车线,又称编组线,供办理货物列车解体、集结和编组作业使用的线路;⑤调发线,又称编发线,兼有编组线和出发线的功能的线路;⑥站修线,供在站修理的货车停留用的线路,一般设在编组场的一侧;⑦加冰线,供装运易腐货物的冰冷藏车停留加冰用的线路,一般设在通过车场的外侧或编组场的一侧;⑧货物线,供办理装、卸作业用的线路;⑨整装线,供装载不良或待修货车整理装载状态或倒装货物用的线路,一般设在编组场尾部一侧;⑩机走线,供机车出入机务段走行用的线路;机待线,供换挂的机车暂时停留用的线路,一般设在到发线附近;安全线,为防止两条会合或交叉的主要进路上发生行车冲突或行车与调车作业冲突,用以隔开进路的线路,一般设在到发线的两端(图1),也有设在区间的安全线;避难线,在陡坡地段车站,为防止在陡长下坡道上失去控制的列车颠覆,或与站内停留车冲撞,或与前方区间列车冲撞而设置的线路,一般设在下坡方向的出站端或进站端(图2);牵出线,设在铁路的车场或货场一端,供调车机车牵引车列进行解体、编组等调车作业的线路。
  
  

说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条