1) double leveled differential diffusion bucket
厂前双层差动扩散挑流消能
2) slit-type flip bucket
厂前窄缝挑流消能
3) Trajectory energy dissipation
挑流消能
1.
Trajectory energy dissipation,as one of main dissipation ways of hydropower stations that locate in deep valleys and with high water head and large discharge capacity,is much effective.
挑流消能作为高水头、大流量、深峡谷水电站的主要消能方式之一,效果比较理想,但同时带来了严重的泄流雾化现象,对枢纽区建筑物及下游岩质边坡的稳定造成极不利的影响,日益引起广泛的关注,迫切需要进行预测研究。
2.
This paper made an overall study on the erosion control of a plunge pool for dam body flood discharge trajectory energy dissipation in the case of a narrow valley, a high arch dam and a large discharge, and its concrete lining optimization design.
对窄河谷、高拱坝、大流量坝身泄洪挑流消能水垫塘的防冲安全及其混凝土衬砌优化设计问题作了全面研究,结合小湾工程采用局部水工模型试验研究了小湾工程水垫塘衬砌块的抗冲稳定性,提出了应用瞬交流和震荡流理论研究衬砌冲刷破坏机理、建立新的设计模式的新概念,讨论了水垫塘衬砌设计模式的有关问题,并对该工程的设计提出了具体建议。
4) energy dissipation of ski-jump
挑流消能
1.
Research on dynamic characteristics of original rock in the scour pit of energy dissipation of ski-jump;
挑流消能冲坑内基岩体的动力分析研究
5) ski-jump energy dissipation
挑流消能
1.
Under the condition of ski-jump energy dissipation,scour hole deviated axis threaten project security.
弯曲溢洪道受弯道折冲水流产生冲击波影响,在挑流消能条件下冲刷坑偏离轴线,威胁工程安全。
2.
The ski-jump energy dissipation is a method of energy dissipation, which is very commonly used in energy dissipators.
挑流消能是消能工中最常用的消能方式之一,应用极其广泛。
6) energy dissipation by trajectory jet
挑流消能
1.
This paper introduces the geographical position of Pingshang Reservoir and the layout condition of its spillway, and analyzes the relationship between the water level of spillway and the discharge flow, and expounds the calculation of the water surface profile and energy dissipation by trajectory jet.
介绍了坪上水库的地理位置和溢洪道的布置情况,分析了溢洪道水位与泄量的关系,阐述了水面线和挑流消能计算。
2.
Based on the hydraulic model test on the spillway of Xisuixing Reservoir,this paper researches the hydraulic characteristics such as the discharge capacity,flow velocity distribution,flow states and energy dissipation by trajectory jet at the spillway exit,which can be used as a reference for similar hydraulic project.
以西岁兴水库泄洪洞水工模型试验为基础,对泄洪洞的泄流能力、流速分布、流态以及泄洪洞出口挑流消能等水力特性进行了研究,为类似的水利工程设计和建设提供了借鉴。
3.
This paper sums up the research results related to the energy dissipation scheme of spillway obtained in China and foreign countries,focusing on energy dissipation by trajectory jet,energy dissipation by underflow and energy dissipation by stepped spillway,and introduces some new type energy dissipation schemes and model test results.
将国内外有关溢洪道消能方案的研究成果进行了归纳和总结,着重探讨了挑流消能、底流消能和阶梯溢洪道消能,并介绍了一些新型的消能方案和模型试验成果。
补充资料:消流
1.犹消融。 2.销售流通。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条