1) Zaoshi reservoir
皂市水库
2) Zaoshi Hydropower Station
皂市水电站
1.
Slope accumulation body stability of Zaoshi Hydropower Station and research on reinforcement measures
皂市水电站堆积体边坡稳定性及加固措施研究
3) Zaoshi Hydroproject
皂市水利枢纽
1.
Planning and design of resettlement for construction of Zaoshi Hydroproject and Implemention Practice;
皂市水利枢纽移民安置规划及实施过程
2.
Hydraulic design for flood discharge and energy dissipation structures of Zaoshi Hydroproject;
皂市水利枢纽泄洪消能建筑物水力设计
3.
Selection and verification of dam base surface for Zaoshi Hydroproject;
皂市水利枢纽大坝建基面选择与验证
4) Zaoshi
皂市
1.
There are 5 collapse accumulations around the dam site at Zaoshi of Xieshui River,whose risk indix(N) is 4.
皂市水利枢纽库坝区有较大规模的崩塌堆积体5处。
2.
The excavated slope height of right bank in Zaoshi hydropower arrive to 140m.
皂市水利枢纽右岸人工边坡最高达到110~140m,边坡稳定性及其对施工期和运行期的安全影响是枢纽工程的主要地质问题之一。
5) Dieshui City Water Control Project
渫水皂市水利枢纽
1.
The surrounding rocks of the Yingzuiyan Tunnel of the access road on the left bank of the Dieshui City Water Control Project mainly consists of the classII, III, IV and V rocks which have complex geological conditions and bad tunnelforming conditions.
渫水皂市水利枢纽左岸上坝公路鹰嘴岩隧道围岩主要为Ⅱ、Ⅲ、Ⅳ、Ⅴ类围岩,地质条件复杂,成洞条件差。
6) zaoshi hydroelectric station
皂市电站
补充资料:水库调节防凌(见水库调度)
水库调节防凌(见水库调度)
shuiku tiaoiie fangling水库调节防凌见水库调度。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条