说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 株洲枢纽
1)  Zhuzhou Terminal
株洲枢纽
1.
The paper expounds the significance of setting up correctly the layout of approach and despatching lines of the terminal, and introduces the overall layout of the Zhuzhou Terminal before and after the reconstruction.
论述了正确处理枢纽站进出站线路布置的意义,介绍了株洲枢纽扩建前后的总体布局。
2)  Zhuzhou Navigation & Hydropower Complex
株洲航电枢纽
1.
Construction Diversion and Current Control of Zhuzhou Navigation & Hydropower Complex;
株洲航电枢纽施工导流及水流控制
3)  Changzhou Water Project
长洲枢纽
4)  Gezhouba Project
葛洲坝枢纽
1.
Comparative experiments of protection material for Yangtze River bed downstream of Gezhouba Project;
葛洲坝枢纽下游河床护底结构型式比选试验
2.
The river channel change, the bed load and bed material armoring, and the water level lowering after the operation of the Gezhouba project are analyzed based on the topographic and hydrologic data.
根据实测地形和水文泥沙资料 ,分析了葛洲坝枢纽运用后宜昌河段的河床冲淤变化、推移质和床沙的粗化以及枯水位的变化。
5)  Changzhou Hydraulic Complex
长洲水利枢纽
1.
Optimization of construction diversion scheme for Changzhou Hydraulic Complex;
长洲水利枢纽工程施工导流方案优化
2.
Navigation Design during Construction Period in 3rd-phase Construction Diversion and River Closure of Changzhou Hydraulic Complex;
长洲水利枢纽工程三期施工导截流期施工通航设计
3.
Reservoir area inhabitant resettlement planning design for Changzhou hydraulic complex;
长洲水利枢纽库区移民安置规划设计
6)  Changzhou Multi-purpose Water Project
长洲水利枢纽
1.
Computer Monitoring System Design for Double-line Single Ship Lock of Changzhou Multi-purpose Water Project;
长洲水利枢纽双线单级船闸计算机监控系统设计
2.
Safety and Stability Control System Design andStrategy Study for Changzhou Multi-purpose Water Project;
长洲水利枢纽电站安全稳定控制系统设计及策略研究
3.
Navigation Design in Construction Period for Changzhou Multi-purpose Water Project;
长洲水利枢纽工程施工期通航设计
补充资料:采用刚性滑道密封的铅精矿烧结机(株洲冶炼厂)


采用刚性滑道密封的铅精矿烧结机(株洲冶炼厂)


采用刚性滑道密封的铅精矿烧结机(株洲冶炼厂)
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条