1) per unit method
标么值法
1.
A complex short circuit capacity method is proposed as an alternative to the per unit method.
复数短路容量法可替代常规的标么值法。
2) per-unit value
标么值
1.
A mathematical model of salient pole synchronous machine based on normalized per-unit value of Xad is studied in this paper,and the simulation model of it is derived according to requirements of SIMULINK S-function.
研究基于Xad标么值系统下凸极同步电机的数学模型,按照Simulink S函数的要求,导出凸极同步电机的仿真模型。
3) per-unit torgue
转矩标么值
4) per-unit synchronizing torque
整步转矩标么值
5) per unit system
标幺值法
1.
DSP2407 controller is adopted to complete the research & development of three-phase PWM rectifier based on the per unit system and the current decoupled control.
采用DSP2407控制器、基于标幺值法及电流解耦控制完成了三相两电平PWM整流电源的研制。
6) mark-value algorithm
标值算法
1.
Through analyzing the three forms of floating time and the affection to both preceding and succeeding activities of an activity floats consumed,mark-value algorithm based on Activity-on-Arc Network is designed.
针对任意工序使用机动时间对它的前、后继工序产生影响的问题,即机动时间传递性问题,利用机动时间的几类时差,特别是前、后共用时差、双单时差和双共时差,通过对工序使用机动时间的三种方式及对前、后继工序的影响进行分析,提出基于双代号网络的标值算法,运用该算法量化了任意工序使用机动时间对整个网络中工序机动时间的影响程度和范围,并以此为基础,形成系统的分析体系。
2.
,the problem of activity float spread property,the paper gives a mark-value algorithm based on activity-on-arc network planning and proves its correctness by applying several concepts of float,especially forward common float and back common float.
针对任意工序使用机动时间是否会影响它的前、后继工序和平行工序的问题,即机动时间蔓延性问题,利用机动时间的几类时差,特别是前、后共用时差,提出了基于双代号网络计划的标值算法,证明其正确性,运用该算法量化了单个工序使用机动时间对整个网络计划的影响程度和范围,系统分析了各工序机动时间的变化规律,并修正了时间参数计算公式。
补充资料:么
【么】
(杂语)俗语。训为否或否耶。语录多用之。【又】(术语)(参见:婆)
(杂语)俗语。训为否或否耶。语录多用之。【又】(术语)(参见:婆)
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条