1) continuous setting out method
连续放线法
1.
After using a method or changing of coordinates, a formula of calculating coordinates, called the unified formula, which is suitable for an arbitary point on whole curve was deduced, and a new kind of setting out method was obtained, namely the continuous setting out method for which was confirmed.
用坐标变换法推导出一个适用于整条曲线上任意点的坐标计算统一公式,从而得到了一种新的放线方法─连续放线法,并对其进行了验证。
2) sublevel exhaust
逐段连续排放法
3) total exhaust
整体连续排放法
1.
Sublevel exhaust and total exhaust are two way tor local fan working.
为保证排放瓦斯的安全性 ,研究了局部通风机排放瓦斯的逐段连续排放法和整体连续排放法 ,比较而言 ,整体连续排放法安全性好 ,用工少 ,排放时间短 ,经济效益好 ,应推广使
4) sequential linearization method
连续线性化方法
1.
A sequential linearization method for a class of nonlinear semidefinite programming;
一类非线性半定规划问题的连续线性化方法
5) continuous humping
连续溜放
1.
It puts forward a model and the concepts of critical speed analytical method and the advance locking,finding an advanced method in order to prevent the back side conflict in continuous humping.
重点讨论解决编尾连续溜放侧面冲突的方法,使对这种问题的认识和处理从以往的经验处理上升到理性上,提高了安全性和效率。
6) continuous grazing
连续放牧
1.
Rotational grazing (RG) and continuous grazing (CG) were compared in degraded desert steppe in Inner Mongolia on family ranch scale.
结果表明 ,在相同的载畜率条件下 ,划区轮牧制度通过对放牧利用时间与空间的合理配置 ,使建群种短花针茅与优势种无芒隐子草在质量百分比、重要值、生产力等方面比连续放牧都有所提高 ,与围栏禁牧的对照小区有同样的恢复效果。
补充资料:放线验线应注意哪些事项
放线验线时应注意以下五点注意事项:
1、先放线后验线。应当坚持先放线后验线的程序。一般建设工程项目可按照周围的参照物,由施工单位放线,施工放线后,建设单位向城市规划行政主管部门申请验线并报形式日期,城市规划行政主管部门的管理人员到现场验门的勘测队伍进行放线,放线后经规划管理人员验线。
2、作好放线验线记录。无论由谁放线、验线、都必须作好放线、验线记录。
3、在放线的过程中,对验线时需要查验的关键点必须打上固定标志。
4、放线时,原地上需要拆除的建筑物、构筑物应当全部拆除掉。
5、地形复杂的用地,应平整后再放线。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条