3) initial impoundment
初期蓄水
1.
Analysis of the results of dam deformation monitoring of Three Gorges Project during its initial impoundment period;
三峡工程初期蓄水大坝变形监测成果分析
4) Initial impoundment
蓄水初期
1.
Numerical simulation of salinity transport for initial impoundment of Muguandao reservoir;
沐官岛水库蓄水初期盐分运移数值模拟
5) the first impoundment
初次蓄水期
1.
This paper presents that during the first impoundment of Ertan reservoir in May 1998,mathematic relationship between the loads acting on the dam & the respondent displacements was established by use of statistic model & determined model theoretic analysis method based on the observation results of the plumblines installed in the dam & monitoring network surveying results.
简要介绍了在二滩拱坝1998年5月初次蓄水期,通过拱坝垂线和监测网系统,用统计模型和确定性模型理论分析方法,建立了施加于坝体各作用量与坝体受作用后的效应量(变位)间的数学关系;并根据预先计算分析成果,提出了在初次蓄水运行中拱坝变位的参考预报值,实时对二滩拱坝实际工作状态作出安全评判。
补充资料:水库初期蓄水
水库初期蓄水
reservoir initial filling
shulku ehuq!xushu}水库初期苗水(reservoir initial filling)研究和制订水库从开始蓄水至正常运行阶段,水库运行和充蓄方式的方案.水库建成后,一般采取边蓄水,边发挥效益的方式进行。水库初期蓄水时间的长短,主要取决于水库容积、来水且与初蓄期任务的大小。初期,水播要时间较长时,都应进行水库初期充蓄计算。在水库初期蓄水期间,要权衡水电站供水、供电的效益,并且协调来水、供水、蓄水以及水资源绿合利用各用户之间的矛盾。水库初期蓄水计划与工程进度安排、移民搬迁工作、水电装机程序及工程效益发挥有着密切的关系。以下主要针对多年调节水库进行阐述。 水库初期,水的.则和研究内容其主要内容如下。 (1)根据近期和远景兼顾的原则,选定电站在水库初期蓄水期的发电计划.水库初期运行时,多蓄水,少发电,可较早进人正常运行阶段,对于发挥电站的正常效益是有利的,但却相应减少了初期运行的效益,反之,虽然初期运行效益较大,却是以牺牲正常效益作代价的。故两者必须兼顾。 (2)协调水库充蓄期各用户对水资源要求的矛盾.在水库初期蓄水期间,由于水库蓄水量较小,尚不能充分满足各用户对水资源的要求,存在较突出的供需矛盾,必须按综合利用效益最大的原则,制订水库初期蓄水期间水资源综台利用方案。 (3)制订水库充蓄期运行和充蓄的方式. 水库初期,水的侧约因索主要有:①坝、水库及发送电工程的施工和水库清理及移民安1的进度。②根据保坝要求的水库允许最高蓄水位和充蓄的速度.③因水库蓄水可能导致的库岸坍塌及水库诱发地震问题。 水库初期,水阶段划分初期蓄水计算一般可分为两个阶段,第一阶段是由封堵导流设备,开始充蓄水库至第一台机组开始发电(发挥效益)的时期,即单纯蓄水(当然还需泄放下游发电或综合用水所必豁的流量)阶段,第二阶段由水库开始发电(发挥效益)至正常运行时期,即初期运行阶段. 侧订初期,水方案的步弃首先应根据施工进度计划和综合利用各用户的具体情况,拟定各种可能的综合利用方案. 单纯蓄水阶段①根据施工进度,移民情况及发电要求等设定水库开始蓄水的时间,根据水轮机的最小工作水头,或其他综合用水部门要求的最低水位,确定水电站初期运行的起始水位Z。。②来水过程,一般可采用中等枯水年(P一75%)和平水年(P=50%)。③进行初期蓄水计算,推求水库蓄水达到初期运行水位Z。的时间。计算中应注意扣除在蓄水期必须向下游泄放的水量(如发电、居民生活用水、滋概等)及水库落发及渗漏损失。 初期运行阶段 (1)假定若干个初期蓄水年数。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条