1) integrated precast structure
装配整体式结构
2) assembled-monolithic structure
装配-整体式结构
4) assembled monolithic
装配整体式
1.
Prestressed assembled monolithic of concrete sandwich plate and it's service specification
预应力装配整体式混凝土夹层板及其常用规格
2.
The two-span assembled monolithic continuous secondary prestressed concrete sandwich slab was tested.
[提要]进行了柱网为6m×6m的两跨连续装配整体式二次预应力夹层板的试验研究,得到了正常使用极限状态下结构的裂缝发展规律和荷载挠度关系,分析了结构的受力特点。
5) precast monolithic
装配整体式
1.
The contrast tests of one precast monolithic R.
介绍一个装配整体式钢筋混凝土框架中柱节点与另一个现浇钢筋混凝土框架中柱节点的对比试验。
6) fabricated structure
装配式结构
1.
Combining with the construction of 110kV substation,several designs and building technologies of fabricated structure are researched,of which fabricated RCS structure can implement the construction of total assembly.
结合110kV变电站的建设,研究了几种装配式结构的设计和建造技术,并指出装配式混凝土柱-钢梁组合结构能够实现全装配化施工。
补充资料:钢结构零件装配
钢结构零件装配
assembly for steel structure part
gangjlegoul乍ngjlon Zhuangpel钢结构零件装配(assembly for steel stru-ct盯e part)采用定位焊、工夹具等方法将加工好的零件按施工图要求,组装成部件和构件的过程。构件组装时,按其放置的形态可分为平放装配法、立装法、倒装法三类,平放装配法是把站立的构件(立柱、彬架等)平放在工作台架上进行装配的一种方法,它的优点是减少高空作业,加大作业面积,生产效率高,操作安全,一般用于构件能平放的装配。立装法一般用于大型筒体结构的装配,是把一节筒体立放在工作平台上,找好水平后再将另一节筒体吊起进行组装。倒装法主要用于上大下小的锥形漏斗的装配,即将这种平放、立放都不便操作的构件,翻转180“,使其大口落地而进行装配。 组装前,装配人员应首先熟悉施工图和工艺规程,依据工艺要求确定具体的装配方案。装配工作一般在平台或台架上进行。平台一般采用钢板拼接,其表面应达到一定的水平度。台架一般为用大型工字钢制成的铁凳,铁凳应坚固稳定并具有适合装配的高度。装配前应按零件加工清单清点零件数量,零件应按指定地点堆放,以便顺利装配,同时应按施工图检查零件的加工精度,并核对材质。 装配用工夹具焊接结构装配时,要对零部件配备适当的支撑、定位及夹紧的工夹具,以保证产品的正确尺寸和工作效率。常用的工夹具有定位器和压夹器。 定位器定位是确定所装配零部件的正确位置,即使装配的零件(或部件)在其确定的位置上不得自由移动。常用的定位器有装配用定位样板、挡块、定位销等(图1)。 压夹器是对已经定位的零部件施加压紧力的夹具。夹紧效果将直接影响产品的质量。压夹器一般分为楔形压夹器、气压压夹器、液压压夹器等,常用的压夹器见图2。 装配方法构件的装配除在总体上可分为平放装配法、立装法、倒装法外,在具体施工中又可根据结构设计的要求分为铆接件装配、焊接件装配和螺栓连接装配。铆接件装配比较简单,大多利用零件上的孔进行定位,用普通螺栓拧紧固定。焊接件装配的方法较多,如部件装配法、划线装配法、仿形装配法和胎具装配法等。螺栓连接装配可分为普通螺栓连接装配和高强度螺栓连接装配。 厂、、部件装配法是指将构件分解 厂/_.__._…二“.__ 广\//’为若干个部件进行装配,然后再整 。一了广厂成体组装成构件,以提高装配的工作 /一七一叹一必一气效率和减小装配和焊接过程中产生 乙___一___丫____的应力。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条