2) Yindajihuang project
引大济湟工程
1.
As the natural test project of western route of South to North water transfer project in China,the deep-buried water transfer tunnel of Yindajihuang Project faces the problems of rockburst in hard rock and plastic deformation in soft rock under high geostress.
作为南水北调西线隧洞的天然试验工程,引大济湟工程的千米埋深引水隧洞也面临高地应力下硬岩岩爆和软岩塑性变形问题。
3) attraction power of large country's economy
大国经济吸引力
5) Huangshui River
湟水
1.
Analysis on Characteristics of River Terrace and Plateau Evolvement of Huangshui River in Xining Basin;
西宁盆地湟水河流阶地与高原演化特征分析
2.
Analysis on the Influence of Climate Variation to Runoff Depth of Huangshui River;
气候变化对湟水径流量影响分析
3.
Analysis on ample flow and low water for upper reaches in Huangshui river;
湟水上游河川径流丰枯分析
6) Huangyuan
湟源
1.
Construction Adjustment on Seedling-raising Industry in Huangyuan;
湟源县苗圃产业化结构调整
2.
Restrict Factors and Countermeasures on Forestry Development in Huangyuan;
湟源县林业发展制约因素及发展对策
3.
Tendency and Countermeasures on Market of Stock Seedlings in Huangyuan;
湟源苗木市场动态及对策
补充资料:“引大济湟”工程
"引大济湟"工程从湟水河一级支流大通河上游石头峡建库引水,将7.5亿m3大通河水,经29.6km调水干渠调入湟水河一级支流北川河上游的宝库河,解决湟水两岸山区和干流资源性缺水问题。工程实现后,可扩大农田灌溉面积118.44万亩,新增生态林草灌溉面积89.38万亩,向城市和工业用水增加供水量2.78亿m3,河道生态用水增加1.85亿m3。"引大济湟"工程因工程量大、投资大,本着"先易后难、分期实施、尽快见效"的原则,分三期实施。一期为黑泉水库和湟水北干渠一期工程,二期为石头峡水利枢纽、调水总干渠和北干渠二期工程,三期为南岸提灌工程。