1) ecological construction
生态施工
2) Dynamic construction
动态施工
1.
An analytic study of stress and displacement during dynamic construction is conducted on the immerged underground tunnel.
针对深埋地下洞室,寻求洞室动态施工中围岩应力及位移场的解析解。
2.
Based on deep foundation excavation case,this paper introduces the application of monitor and dynamic construction technology in soft soil foundation pit with internal bracing system, and it has important meaning to restrict the strain, to improve the safety of the excavation and to protect the surrounding environment.
本文将结合工程实例,阐述监测与动态施工技术在内撑式软土基坑工程中的应用,及其对于控制基坑变形,提高基坑开挖的安全及对周围环境保护的重要意义。
3.
Based on the project of expressway tunnel in Zhejiang Province,the entire dynamic construction process of the tunnel is simulated by 3-dimention finite element method with MARC software.
以浙江上三线高速公路隧道为工程背景 ,应用大型有限元软件MARC对洞口段隧道进行动态施工全过程三维有限元模拟 。
3) staged construction
动态施工
1.
Back analysis on staged construction in transversely isotropic viscoelastic soil and its application to geotechnical engineering;
考虑动态施工过程的岩土介质横观各向同性粘弹性反分析及其工程应用
2.
Marc 3-D software,which induced by the tunnel staged construction and the traffic loading during the working period.
Marc三维有限元分析软件,模拟了隧道分区分层动态施工和运营期行车荷载对紧邻高架桥的影响,重点分析了扩大基础基底反力增量、基底中心沉降、扩大基础倾斜和基坑侧向位移的发展规律。
3.
The staged construction mechanics of the steel sheet pile retaining structure for a cofferdam project are numerically simulated using 3D FEM incremental computing method.
应用三维有限元分析,采用增量计算方法,对某围堰工程承台钢板桩围护结构进行了动态施工力学的三维数值模拟。
4) construction behavior
施工性态
1.
Numerical simulation and analysis of construction behavior of shallow tunneling by excavation;
浅埋暗挖隧道施工性态的数值模拟与分析
5) construction state
施工状态
1.
Forward-calculating optimization method for determining rational construction state of cable-stayed bridges;
正装优化法确定斜拉桥合理施工状态
2.
The forward iteration method is used to determine the rational construction state of the Jianghan Fourth Bridge in Wuhan(a symmetric single pylon PC cable stayed bridge).
采用正装迭代法确定武汉江汉四桥(不对称独塔PC斜拉桥)的合理施工状态,准确模拟了主桥施工过程,分析了主桥合龙方案。
3.
The rational completion state of the bridges was given by the least bending energy method,the solution to the rational tensioning cable forces during construction was obtained by the forward iteration method and the rational construction state of the bridges was determined.
利用最小弯曲能量法给出合理成桥状态;通过正装迭代法求出合理施工张拉索力,确定合理施工状态;采用自适应和反馈结合的施工控制方法进行施工过程控制。
6) hot construction
热态施工
1.
At the same time author elaborates the problem that how to enhance the construction quality of hot construction of coke oven and prolong campaign life to raise economic benefits.
介绍了重点热态工程项目的施工方法及要点 ,阐述了如何通过施工控制提高焦炉热态施工质量、延长焦炉炉龄 ,从而提高焦炉投资的经济效益 ,指出焦炉热态施工与烘炉升温有紧密联系 ,具有很强的时间性、专业性和次序
补充资料:施工企业技术组织措施计划(见施工企业技术)
施工企业技术组织措施计划(见施工企业技术)
technical and organize measurement plan in construction enterprise
施工企业技术组织措施杯茹”岑,~‘_:_,organize measurement plan in eonstruetionenterPrise)见施工企业技米管理基本制度。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条