1) pile foundation uplift
桩基冻拔
1.
A frozen soil engineering problem of pile foundation uplift, is analyzed using fracture mechanics method, and a simplified model for calculation the stability of pile foundation uplift is presented.
对桩基冻拔的冻土工程问题进行了断裂力学分析,并给出简化模型。
2) pile foundation in frozen soil
冻土桩基
3) uplift pile
深基础抗拔桩
4) upward freezing pulling
冻拔
1.
The observation of upward freezing pulling phenomenon about pile foundation applied to the artificial lakeshore shipway of garden buildings in seasonal frozen soil zone;
季节性冻土地区人工湖岸船台桩基础“冻拔”现象的观测
5) Pile Pulling
拔桩
1.
FEA of Deformation in Pile Clamping Box of Hydraulic Static Pile Driver under Pile Pulling;
液压静力压桩机夹桩箱拔桩变形的有限元分析
6) upward freezing pulling displacement
冻拔位移
补充资料:拔桩机
利用振动、静力或锤击作用将桩拔出地层的桩工机械。拔桩作业常采用相应的振动沉桩机、静力压桩机或双动汽锤,再配以桩架和索具,故也称振动沉拔桩机、静力压拔桩机。桩工施工中以振动拔桩较普遍,作业时,将振动拔桩机固装于桩头,通过弹簧吸振器和索具悬挂于吊钩下,开动拔桩机,振动器产生的振动,引起桩和土体共振,土体结构破坏,桩身与土体间摩擦力减小,同时收紧索具,将桩逐渐拔出。若采用偏心块式振动器,因沉桩和拔桩阻力方向不同,必须对偏心块进行调整。此种拔桩设备结构简单,拔桩效率高,有发展前途。液压拔桩机利用其夹桩器夹住桩头,液压缸强制顶压夹桩器,使之向上顶升一段距离,将桩逐段拔出,适用在粘土、砂土或含少量砾石的土层中拔工字钢或型钢桩。也有采用机械方法拔桩的,即由电动机驱动卷扬机,利用钢丝绳滑轮组的拉力将桩强制拉出地面。使用方便,成本低,但拔桩力不大、设备笨重、拔桩效率低,只适用于软土地层施工。利用双动汽锤拔桩,系将锤体倒置,固定于桩头,并悬挂于索具下,先将土中桩头晃动,减低桩和土壤间紧密度,然后开动汽锤,向上锤击振动,收紧索具,将桩逐渐拔出,可在各种土层中拔混凝土桩及其他桩。