1) super-long steel strand
超长钢束
2) super-long restraint
超长束
3) myriametre rail
超长钢轨
1.
On the basis of the characters of HG - II myriametre rail welder and thetechnological request of rail gas pressure welding in the field, a ra.
本文根据HG—II型超长钢轨气压焊机的特点和超长钢轨气压焊的工艺要求,以FX_(2N)—80MT型PLC为控制核心,详细设计了加热器摆动对中机构、三段压力自动转换机构、气体配比与流量控制软硬件以及焊接过程控制软硬件等,研发成功了一套适用于超长钢轨气压焊的自动控制系统。
4) long bundles of the steel strand
钢绞线长束
1.
This paper sums up the problems appearing easily in the tensioning construction of the long bundles of the steel strand in the long-span beam bridge,advances some solving measures,and probes into the control measures of developing the tension quality.
总结了大跨度混凝土梁桥的钢绞线长束张拉施工中容易出现的问题,提出了处理措施,探讨了提高张拉质量的控制措施。
5) super-long steel structure
超长钢结构
1.
Numerical simulation analysis is made on a super-long steel structure by using ANSYS software to find out the inner forces of main components and the total longitudinal displacements under various temperatures,and three different design schemes are studied: expansion joints,non-expansion joints and slotted hole structure.
应用ANSYS软件对一超长钢结构厂房进行数值模拟分析,分别计算了结构在设置伸缩缝、不设置伸缩缝和设置长圆孔结构这三种情况下,当温度变化时主要构件的内力及整体纵向位移。
6) very long prestressing strand
超长预应力束
1.
The model tests for the very long prestressing strands of Yeshan River Bridge on the West Section of Shanghai-Chengdu Expressway were made,the initial tensile force and load holding duration of the strands were studied and the research findings of the initial tensile force and load holding duration of the same type of the strands of several other bridges were provided.
以沪蓉西高速公路野山河大桥的超长预应力束为研究对象,进行模型试验,研究超长预应力束的初张力及张拉持荷时间,并提供了其他几座桥梁的超长预应力束初张力及持荷时间的研究成果。
补充资料:90t超高功率电弧炉正在出钢(沙钢)
90t超高功率电弧炉正在出钢(沙钢)
90t超高功率电弧炉正在出钢(沙钢)
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条