1) steel tower high pier
钢塔架高墩
1.
According to the random vibration theory, the whole process while the freight cars run on the Tian Sheng bridge with steel tower high piers is simulated by the computer.
将列车-梁-钢塔墩视为一整体振动系统,采用随机振动理论,首先用计算机模拟了货物列车通过天生桥钢塔架高墩(高43m)全过程,然后从理论上分析了该墩横向振动特性,结果与现场实测吻合较好。
2) Steel-Reinforced Concrete high bridge pier
钢骨架高桥墩
3) tall and slender steel tower
高柔钢塔架
1.
Based on the technology design and the structural conceptual design,the structure design,foundation design,installation,and the control of the maching precision of the tall and slender steel tower are studied.
从设计条件和结构概念设计出发,对高柔钢塔架结构设计、基础设计与施工、安装与加工精度控制等方面进行了研究与探讨。
5) viaduct with tall piers
高墩高架
1.
The construction method of full space support,which can t satisfy the construction needs of viaduct with tall piers,is replaced by the construction method of truss frame platform.
满堂支架施工方法已无法满足高墩高架连续梁桥的施工,代之的是架空平台施工,架空平台采用逐跨推进施工,经济性和安全性好,此外,该平台还可以作为悬臂施工的挂篮,墩柱施工的爬升模架及用于架设简支梁桥的架桥机。
6) high-pier bracket
高墩托架
1.
With the construction practice of Yangjialing Extra-large Bridge,this paper introduces the method of applying prestressing technology to preload high-pier brackets in the construction of 0# girder section of the continuous rigid-frame bridge with high-piers.
结合杨家岭特大桥施工实例,介绍了在高墩连续刚构桥梁0号梁段施工时应用预应力技术,对高墩托架进行预压的方法,并与传统堆载的预压法进行了比较。
补充资料:90t超高功率电弧炉正在出钢(沙钢)
90t超高功率电弧炉正在出钢(沙钢)
90t超高功率电弧炉正在出钢(沙钢)
说明:补充资料仅用于学习参考,请勿用于其它任何用途。