1) design of depot station
区段站设计
1.
The article analyzes the status quo and the existing problems of the depot stations in the whole railway system and describes the influence of the development of traction power on layout and design of depot stations.
分析了全路区段站的现状和存在问题;阐述了牵引动力的发展对区段站布点与设计的影响;根据当前牵引动力变革的形势,对机务布点、长交路距离、区段站设计,以及新线与既有线接轨点的设计方案等问题作了探讨并提出了建议。
3) Railway district station
铁路区段站
1.
The key problem of making the plan of using locative in the process of DSS for railway district station is studied in this paper.
铁路区段站决策支持系统的研究实现 ,对实现铁路调度指挥自动化有着重要意义。
4) layout of depot station
区段站布点
5) website design
网站设计
1.
Discussion and Practice on the Principles of University Library Website Design——A Case Study of the Tsinghua University Library Website Redesign;
大学图书馆网站设计理念的探析与实践——清华大学图书馆网站改版案例研究
2.
Optimization Practice in University Library Website Design
高校图书馆网站设计中的优化实践
3.
The article analyzed the question existing in website construction of the petrochemical enterprise at present, explained basic procedure of petrochemi cal enterprise s website construction, the importance of websites plan and impl ementing scheme, planning method that products demonstrate and basic thinking of website design.
文章针对当前石化企业网站建设中存在的问题进行分析,阐述了石化企业网站建设的基本流程、网站策划的重要性和实施方案,产品展示的策划方法和网站设计的基本思路。
6) station design
车站设计
补充资料:钢铁厂环境监测站设计
钢铁厂环境监测站设计
laboratory design of environmental monitor in iron and steel works
gangtieChang huanjing lianeeZhan sheli钢铁厂环境监测站设计(laboratory designof envirormental monitor in iron and steelworks)环境监测站担负着钢铁厂厂区和生活区的大气、烟气工业废水和外排水、冶金渣和噪声等的日常监测工作,配合污染事故分析的监测和工程验收的环境监测,以及提高监测技术的研究工作。 钢铁厂一般设置一个全厂性的环境监测站,主要有大气、烟气、废水、废渣和噪声监测室,数据处理室,仪器分析室和公用辅助室等。大型企业有重点污染源的车间,还可分设专业监测组。 监测设备应结合企业规模和特点,按监测任务成套配置。各监测室可分别配备气体采样分析仪器和气象仪器;烟道测试和颗粒测定仪器;湿式化学分析仪器;离子计和耗氧量测试仪器;声级计和频谱仪;微型计算机及附属设备;原子吸收分光光度计,气相色谱仪及公用辅助设备。需要分析3,4苯并花时,可选用荧光分光光度计或液相色谱仪,且应设计化验人员的安全保护设施。大中型企业宜配环境监测车,采用计算机网络传输监测数据。 环境监测站站址要求环境清洁,远离振源。一般设计成独立建筑物,也可与安全卫生监测设施合建。 (李润华)
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条