1)  length of spur
坝长
1.
With two spurs′ experimental data,the difference between the scour characteristics of single spur and that of spurgroups was studied,and the influence of the length of spurs,distance between spurs,water flow and sediment charateristics on every scour depth of groups was explored herein.
在单坝试验研究的基础上对群坝局部冲刷问题进行了偿试性的试验研究,根据两坝试验资料,分析了群坝冲刷特性与单坝冲刷特性的区别以及坝长、间距、水流、泥沙条件对群坝中各坝冲深的影响,并且提出了冲深计算方法。
2)  Caiyuanba Yangtze River Bridge
菜园坝长江大桥
1.
Dynamic Similarity Theoretical Analysis of Chongqing Caiyuanba Yangtze River Bridge Model;
重庆菜园坝长江大桥模型动力相似理论分析
2.
The wind tunnel tests for measuring the static wind forces on the bridge girder and the section model wind tunnel dynamic testing for Caiyuanba Yangtze River Bridge in Chongqing are introduced in this paper.
风致振动是大跨度中承式拱桥设计的主要控制因素之一,本文介绍了重庆菜园坝长江大桥风洞主桥节段模型静力三分力试验以及节段模型动态试验的主要内容及相应的结果,介绍了由于双拱干扰下的主拱静力三分力试验和涡振试验及其结论。
补充资料:长岛坝

长岛坝

Nagashima Dam


概  述

  长岛坝位于日本静冈县榛原郡本川根町、大井川(Oigawa)上。混凝土重力坝,最大坝高114m,水库总库容0.78亿m3。工程目的为防洪、维持河道正常功能、灌溉和居民用水。1972年开工,1985年完工。
  大井川流域面积1280km2,河床坡降在岛田市下游为1/220~1/270,是日本为数不多的湍急河川。该河上现已建电站11座,总装机容量约为60万kW。
  坝址控制流域面积534.4km2,水库面积230hm2。有效库容0.68m3。设计洪水流量6600m3/s。正常蓄水位470m,最低水位432m,设计洪水位480m。汛期防洪库容0.47亿m3,兴利库容0.21亿m3。非汛期防洪库容0.2亿m3,兴利库容0.48亿m3
  坝址基岩为泥板岩和砂岩互层。
  枢纽建筑物包括大坝和溢洪道等。
  大坝坝顶高程482m,长328m,坝顶宽7m,坝体积140万m2。坝体边坡坡度为,上游面在高程412m以上垂直,在高程412m以下1∶0.8~1∶0.29,下游面1∶0.78。
  正常泄水建筑物为6个深孔,进口孔底高程422.4m,装有6扇宽5m、高6.5m的高压弧形闸门,最大工作水深60.5m。非常溢洪道为坝顶溢流堰,堰顶高程470m,设有2扇高11.25m、宽6.8m的弧形闸门。选择式取水设备的孔口直径1700mm,进口处孔口中心高程413m。另有1个水位维持管理用泄水孔,孔口直径2350mm,进口处孔口中心高程425m。
  施工导流隧洞设在坝左岸,洞长502.6m,隧洞坡降1/149,净空面积63.4m2,采用新奥法施工。设计流量600m3/s。河床沉积物厚约20m,上游围堰防渗结构为地下连续防渗墙,堰体采用CSG法施工,汛期堰顶可过水。
  基础开挖总量118万m3,采用常规台阶法开挖。基岩以下10m范围内分二段进行固结灌浆。
  由于坝内泄洪孔洞多而大,故高程373~388m采用RCD施工法。在此高程以上采用柱状浇筑法,浇筑层厚2m,总浇筑量64.66万m3。采用固定式塔机进行浇筑。