1) extreme flood beyond design standard
特大超标准洪水
2) countermeasure
[英]['kaʊntəmeʒə(r)] [美]['kauntɚ'mɛʒɚ]
超标准洪水
1.
Prevention countermeasure of excess flood standard in middle and downstream of Liaohe river;
辽河中下游防御超标准洪水对策
3) hyperstandard design of flood control
超标准设计洪水
4) over-level flood
超标洪水
1.
Integrated risk assessment of levees under over-level flood condition and a case study;
超标洪水下堤防失事风险评价及工程应用
5) standard of flood control
洪水标准
1.
Studies on standard of flood control for the outflow canal of spillway;
溢洪道出水渠洪水标准的探讨
2.
In accordance with the request of different protected objects of each function unit of the spillway,the way and rule of defining the standard of flood control for the outflow canal of spillway is expounded,in order to reduce the cost of the outflow canal or the whole spillway.
根据溢洪道各功能段不同防护对象的要求,阐明溢洪道出水渠洪水标准确定的原则与方法,以期降低其乃至整个溢洪道的工程造价。
补充资料:超标准洪水紧急措施
对超过防洪系统或防洪工程设计标准的洪水所采取的应急对策。从经济合理和现实情况出发,防洪设施的保证率只能达到一定的设计标准,而洪水由于受自然因素及人类活动等影响,具有很大的随机性,每年汛期都可能发生超标准洪水。研究制订重点保护对象和重大工程,在发生超标准洪水时的紧急措施,并事先作好安排,供必要时采用,以避免发生毁灭性灾害。
超标准洪水的处理原则是,在充分发挥工程效能和人民防洪作用前提下,根据洪水特性,因地制宜地进行处理,牺牲局部,以保全重要堤段或重要地区的安全,尽量缩小灾害损失。
在大江大河重要堤段,应预筹临时分洪区,或利用堤防的超高、抢修子堤等适当超泄。水库特别是大型水库一定要严格按照设计规范的校核洪水进行校核,并预先备有非常泄洪设施和措施。对于重要中小型水库亦应分析研究可能发生的超标准洪水,要设置非常溢洪道或其他泄流设备,或采取临时加高加固大坝或破副坝以保主坝等紧急措施,防止洪水漫坝造成溃决。
对于超标准洪水的临时扒口分洪,或堤防溃决的洪水流路、淹没范围和洪水到达时间、水深、流速等应作出分析,及时做好居民转移工作。
超标准洪水的处理原则是,在充分发挥工程效能和人民防洪作用前提下,根据洪水特性,因地制宜地进行处理,牺牲局部,以保全重要堤段或重要地区的安全,尽量缩小灾害损失。
在大江大河重要堤段,应预筹临时分洪区,或利用堤防的超高、抢修子堤等适当超泄。水库特别是大型水库一定要严格按照设计规范的校核洪水进行校核,并预先备有非常泄洪设施和措施。对于重要中小型水库亦应分析研究可能发生的超标准洪水,要设置非常溢洪道或其他泄流设备,或采取临时加高加固大坝或破副坝以保主坝等紧急措施,防止洪水漫坝造成溃决。
对于超标准洪水的临时扒口分洪,或堤防溃决的洪水流路、淹没范围和洪水到达时间、水深、流速等应作出分析,及时做好居民转移工作。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条