说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 吸水速凝挡水子堤
1)  summer dike consisting of water absorbing and quick setting material
吸水速凝挡水子堤
1.
The summer dike consisting of water absorbing and quick setting material is made of the outer geotextile bag-form,the geomembrance inner bag-form with the effective water-retaining material inside and protecting cushion,reinforcing band,water injection hole,anti-seepage strap etc.
吸水速凝挡水子堤是由土工织物做外袋、土工膜做内袋和装在内袋里的高效保水材料以及护垫、加强带、注水孔、防渗带、防渗条等组成。
2)  bay water up
筑堤挡水
3)  a wall to retain the lake
挡住湖水的堤坝
4)  Bank up a river.
筑堤挡住河水。
5)  water absorbent gel
吸水凝胶
1.
A series of salt tolerating water absorbent gels were synthesized by solution polymerisation of acrylic acid,using potassium persulphate as initiator and allyl acrylate as crosslinking agent.
以丙烯酸为原料、过硫酸钾为引发剂、自制的丙烯酸烯丙酯为交联剂,采用溶液聚合法合成了具有较高耐盐性的聚丙烯酸类吸水凝胶,其在去离子水中的溶胀度为1360g/g,在盐水(质量分数0。
6)  high water quick setting
高水速凝
1.
With high water quick setting filling material as the comment, rock or waste rock as the aggregate, through the laboratory experiments and insitu filling experiments.
通过以高水速凝充填材料作为胶结剂、以块石(或废石)作为骨料的室内模拟试验和现场充填试验,利用高水速凝材料具有早强、速凝、采场充填不需脱水的优点,加快采充作业循环,减少采空区的暴露时间,增加保安矿柱采场附近井筒周边岩石的稳定性等特点,本文结合招金股份公司三矿区3号井的特殊开采条件,采用了高水速凝废石浇注充填法,为保安矿柱的安全回收创造有利条件。
补充资料:速末水
1.松花江的别名。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条