1) water abundant and weak ground section
富水软弱地段
2) water-rich soft ground
富水软弱地层
1.
Based on the shield boring of the exit section of Shiziyang tunnel on Guangzhou-Shenzhen-Hongkong passenger-dedicated railway,the authors present the selection and optimization of the boring parameters,the control measures,boring process,difficulties and the countermeasures of the large-diameter slurry shield in water-rich soft ground with shallow cover.
结合新建广深港铁路客运专线狮子洋隧道工程出口段的盾构施工,介绍富水软弱地层浅埋大直径泥水盾构掘进参数选择与优化、控制措施、施工过程及重难点、常见问题及处理措施。
3) watery sector
富水地段
4) watery and weak surrounding rocks
富水软弱围岩
1.
Overlapping tunnels will influence each other during construction stage,and will result in a series of problems such as ground subsidence controlling,particularly for watery and weak surrounding rocks in shallow depth.
重叠隧道施工必然发生相互影响,产生诸如地表沉降难于控制等一系列问题,特别是在浅埋富水软弱围岩条件下修建重叠隧道,此类问题更加明显。
5) soft section of coal bed
煤层软弱地段
6) sector with shallow burial depth and abundant groundwater
浅埋富水地段
1.
The Changling Tunnel goes through the Kuqiaoxi sector with shallow burial depth and abundant groundwater.
长岭隧道通过苦荞溪浅埋富水地段,隧道埋深浅,最小埋深不足12m。
补充资料:泥泞地段(见水障碍物)
泥泞地段(见水障碍物)
muddy area
nining diduan泥泞地段(muddy area)见水障碍物。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条