1) uranium mill tailings depository
铀水冶尾矿库
2) uranium mill-tailings
铀水冶尾矿
1.
The mixtures of power lime and cinder were used as PRB materials to study the feasibility of in-situ remediation of acid seepage water from uranium mill-tailings.
使用消石灰与炼锗煤渣混合物作为PRB材料,进行原位处理铀水冶尾矿酸性渗滤水的可行性实验研究。
3) uranium tailing impoundment
铀尾矿库
1.
The paper analyses the feature and damage of radiation safety accident in uranium tailing impoundment,and puts forward the radiation safety management and accident prevention countermea sures for uranium tailing impoundment.
分析了铀尾矿库辐射安全事故的特点及其危害 ,提出了铀尾矿库安全管理和事故预防的对策。
4) uranium tailings impoundment
铀尾矿库
1.
s: Soil covering is an important measure in remedial action for uranium tailings impoundment.
在铀尾矿库补救行动中 ,库面上覆盖土层是其中的一项关键措施。
2.
The basic situation of 3 decommission uranium tailings impoundments and 1 large open pit in Germany is introduced, and some special successful engineering measures are reported in detail, including the wastewater treatment, the covering of exposed uranium tailings beach, the stability of dam slope, the back filling of open pit and so on.
介绍了德国正在进行退役治理的3个铀尾矿库和1个大型露天采坑的基本情况,并对已采用的一些成功的工程措施作了比较详细的说明。
3.
The general remark is introduced on environmental improvement of decommissioning uranium tailings impoundments at home and abroad.
介绍了国内外铀尾矿库退役环境治理概况。
6) Uranium mill tailings
水冶尾矿
补充资料:尾矿分散管及库内尾矿沉积滩
尾矿分散管及库内尾矿沉积滩
尾矿分散管及库内尾矿沉积滩
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条