1) double span tunnel
双跨隧道
1.
In excavation of double span tunnel,there exists a big water-eroded groove.
提要 双跨隧道在岩溶地区施工中遇到大型溶槽,采用弹性地基梁法成功跨越。
2) double-arch tunnel
双跨连拱隧道
1.
Structural calculation and analysis for double-arch tunnel in water-eroded groove;
溶槽地段双跨连拱隧道的结构计算与分析
3) large-spanned tunnel
大跨隧道
1.
Study on excavation sequences and support optimization for shallow-buried and large-spanned tunnels;
基于沪蓉西八字岭隧道大跨段的工程特点,采用大型非线性有限元软件ABAQUS模拟大跨隧道的开挖和支护全过程,提出优化大拱隧道的衬砌结构形式,取消原有设计的中隔墙。
4) large-span tunnel
大跨隧道
1.
Construction methods of large-span tunnel and research on its numerical simulation;
大跨隧道施工方法概述及施工的数值模拟研究
2.
Mechanical analyses and its application in large-span tunnel constructlon in weak rocks;
软岩大跨隧道施工力学研究
3.
On the large-span tunnel construction of the silt clay with sand
大跨隧道粉质黏土富含砂粒段施工
5) large span tunnel
大跨隧道
1.
It is quite important to choose a rational design and construction scheme for construction of large span tunnel.
在大跨隧道的修建中 ,选择一套合理的设计和施工方案是十分重要的。
6) cross-ocean tunnel
跨海隧道
1.
Because ventilating requirement of cross-ocean tunnel, expecially long distancecross-ocean tunnel, ventilating shaft should be set at sea.
跨海隧道,特别是长距离跨海隧道,由于隧道内通风的要求,必须在隧道中间即海中设置通风竖井。
补充资料:一马不跨双鞍
1.同"一马不被两鞍"。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条