1)  on time delivery
按期交货
1.
In this system, production planning and control is execute d, basing on the MRPⅡ/OPT (optimized production techology) theory, defining bot tl e neck parts before planning, using order tracing technology, to obtain the o ptimization target in on time delivery circumstance so that enterprise can mak e best use of the limited resource to improve del.
在该系统中,以按期交货为计划编制的优化目标,事先划分关键件与非关键件,采用定单跟踪的技术编制关键件生产计划,合理使用企业资源,以提高企业供货信用。
2)  commence operation on schedule
按期投产
3)  Deliver on schedule
按期交付
4)  behind completion date
末按期完工
5)  un-scheduled DNA synthesis
非按期DNA合成
6)  responsible tenant
按期交租承租人
补充资料:按期
1.如期,按照规定或约定的期限。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。