1) Power generation at mines
煤矿办电
2) coal mine power supply
煤矿供电
1.
Integrated automation system based on field bus for coal mine power supply;
基于现场总线的煤矿供电自动化系统
2.
Aiming at the difficulty in locating the fault of 35 kV line of coal mine power supply system,a fast fault locating method is brought forward,which comprehensively utilizes the fault original current traveling wave measured at bus and the fault original voltage traveling wave measured at line terminal.
为解决煤矿供电系统中35kV线路故障点不易查找的问题,提出了综合利用母线端检测到的故障初始电流行波和线路末端检测到的故障初始电压行波实现线路故障快速定位的新方法。
3) statical electricity in coal mines
煤矿静电
4) coal mine grid
煤矿电网
1.
Application and research of monitoring warning system in coal mine grid;
监控预警系统在煤矿电网中的应用研究
6) coal mine electro-mechanical equipment
煤矿机电
1.
On coal mine electro-mechanical equipment and its management status assessment appraisal system
煤矿机电装备及管理水平考核评价体系研究
补充资料:厂用电受电
厂用电受电
energizing of auxiliary power system
chongyongd一on sho一Jd一on厂用电受电(energizing of auxiliary powersystem)机组附属设备安装完毕后需通电试运行,所需厂用电源由外部供给,因此厂用电受电是调试工作开始的标志。 受电步骤新建电厂先由电力系统向变电站供电,再依次对高压起动/备用变压器、3~10kv厂用配电装置、厂用工作变压器及380V配电装置供电。扩建电厂因高压起动/备用变压器已经投人运行,故可利用它的电源对扩建的厂用配电装置等供电。 调试项目主要有:①用额定电压依次对空载线路、变电站母线、隔离开关、断瘩器、互感器、变压器及厂用配电装置等进行冲击合闸试验。有条件时.冲击合闸前应先进行递升加压试验。升压过程中注意检查各设备有无放电声及短路现象,发现问题及时处理后再进行升压。②检查三相电压应平衡,相序应正确,各段母线的相位彼此应一致。对配电装置供电时,有时会由于母线电容和与母线连接的电磁式电压互感器的电感相互作用而出现铁磁谐振,此时相电压升高,中性点明显位移。为消除谐振可在电压互感器的剩余电压绕组处并联电阻以去振。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条