1) flaring gate pier of surface outlet
表孔宽尾墩
1.
Application of composite energy dissipation system of stilling basin with flaring gate pier of surface outlet;
泄洪表孔宽尾墩加消力池联合消能工的应用
2) flaring pier
宽尾墩
1.
Test and study for applying crest drop flaring pier at bucket basin of Pingban Hydropower Plant;
平班消力戽应用“顶部跌流型宽尾墩”的试验研究
2.
The concreting work of the 4 flaring piers was done simultaneously,which satisfied the requirements of both construction schedule and safely tiding over the flood period.
居甫渡水电站大坝溢流坝段4个中墩为宽尾墩,配备4套液压滑升模板,4个宽尾墩混凝土浇筑同步施工,满足了施工进度计划和安全度汛节点工期的要求。
3) flaring gate piers
宽尾墩
1.
Study on hydraulic structure of flaring gate piers locating at the upstream of stepped spillway;
宽尾墩后接阶梯溢流坝面水工设施的研究
2.
Aeration of skimming flow on stepped spillway combined with flaring gate piers
与宽尾墩联合使用的阶梯溢流面水流掺气问题研究
3.
When flaring gate piers are on surface spillways in high arch dam,the dispersion of plunging jets from surface spillways is closely related to the charateristics of flow.
宽尾墩应用于高拱坝表孔后,其下泄水流的空中扩散特性与宽尾墩流道内的水流特性密切相关。
4) flaring gate pier
宽尾墩
1.
Effects of flaring gate pier on energy dissipation and atomization caused by flow through the flood discharge facility;
宽尾墩的泄洪消能效果与雾化影响
2.
Hydraulic calculation method for deflecting distance of lower nappe profile in dissipator with flaring gate piers and stepped spillway;
宽尾墩阶梯溢流坝出闸室水舌下缘挑距水力计算
3.
Numerical simulation of energy dissipator with new style flaring gate pier and stepped spillway;
新型宽尾墩和阶梯式溢流坝面一体化消能工数值模拟
5) wide tail pier
宽尾墩
1.
The wide tail pier has been a kind of important energy dissipation forms of bench spillway.
介绍了台阶式溢洪道的由来及发展运用过程,分析了台阶式溢洪道的消能机理及其消能效果,并结合索风营水电站的设计和水工模型试验结果,论述了台阶式溢洪道随着碾压混凝土坝的推广运用,宽尾墩已成为台阶式溢洪道的一种重要的消能形式,为今后类似工程的消能布置设计提供了新的思路。
2.
During the experiment, the fluctuating pressure on the bottom of the dissipative basin is measured and the effects of combined energy dissipation of flipping flow and the wide tail pier are validated.
根据某拟建水利枢纽泄流消能模型试验成果,分析了原设计宽尾墩消能工出现问题的原因,提出了满足设计要求的修改体型,验证了挑流与宽尾墩联合消能的效果, 并量测了消力池底板水流的脉动压力,指出脉动压力概率分布接近正态,水流紊动特性属低频大脉动。
6) Tail-flaring pier
宽尾墩
1.
Tail-flaring pier + stilling pool " is an energy dissipation method first put forward by China 30 years ago.
“宽尾墩 +消力池”是 3 0年前由我国首先提出并发展起来的消能形式。
补充资料:鸭洲尾白墩排
鸭洲尾白墩排,是香港的一个岛屿,地区行政上属於北区。位於鸭洲以西,鸭洲海内。
鸭洲尾白墩排是鸭洲的附属岛屿之一。
在香港的官方地图中,鸭洲尾白墩排的英文岛名叫ap chau mei pak tun pai。
鸭洲尾白墩排上并没有居民居住。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条