说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 基床抛石整平船
1)  rubble bed leveling barge
基床抛石整平船
2)  rubble mound foundation levelling
抛石基床整平
3)  Qingping No.1"bottom-sitted levelling ship for rubble of foundation bed
"青平1号"座底式基床抛石整平船
4)  Rubble-mound foundation
抛石基床
1.
Synthesis Construction Technique of Rubble-mound Foundation Under the Thick Favorable Opposition Diluvium Layer
厚大冲洪积层上水下抛石基床综合施工技术
2.
This paper introduces the experimental method, laboratory equipment and facilities used to determine the friction factor between the gravity steel structure and the rubble-mound foundation.
概述了测定海上重力式钢结构底面与抛石基床顶面间摩擦系数的试验方法、试验装置及设备,在对21种组合386个样本的试验成果进行统计分析的基础上,初步给出了钢与基床(碎石)之间的摩擦系数,同时指出了重力式钢结构应用中有待进一步解决的问题和可能的解决办法。
5)  rubble bed
抛石基床
1.
Diagnosis and renovation to gravity wharf's rubble bed damaged by water flow
重力式码头抛石基床遭水流冲刷破损后的诊断和治理
2.
It is stipulated in current codes to check the resistance to sliding on the top and bottom of the rubble bed,with no consideration of sliding failure inside the rubble bed.
现行规范要求对抛石基床的顶面和底面进行水平抗滑稳定性验算,而不考虑抛石基床的内部滑移破坏情况,当基床较薄时,这样的规定可以保证抛石基床的安全性;当抛石基床比较厚时,基床后侧水平土压力作用不能忽略,基床内部可能会存在水平滑移面。
3.
In explosive ramming of rubble bed of 4# & 5# berths of China Merchants Zhangzhou Development Zone, it briefly introduces the objective and measures at preparation & implementation stages respectively.
针对漳州港 4 #、5 #泊位抛石基床爆夯工序 ,简单介绍爆夯施工准备阶段、实施阶段目标及措施 ,分析爆夯基床的密实效果以及对周围环境的影响。
6)  rubble leveling
抛石整平
补充资料:船形石
船形石
船形石

船形石纵卧虎头崖下的溪流中。长20余米,高阔均10余米,如一艘船只搁浅在溪涧之中。溪水从石下奔流而过。石顶有明嘉靖年间罗文博题刻的大字。

说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条