1) installation of embedded parts
预埋件安装
1.
So,in the construction of breast wall concrete,a series of technique measures are taken in quality contral points as moldboard design,installation of embedded parts,crack prevention of mass concrete and detail treatment,and achieve go.
为此 ,在戊码头的胸墙施工中 ,针对模板设计、预埋件安装、大体积砼防裂以及细部处理等质量控制点采取了一系列的综合性技术措施 ,并取得了良好的效果。
2) fixing technique with pre-buried bolts
预埋安装技术
3) new workmanship for installing embedded metal parts
埋件安装新工艺
4) embedded steel bar installation
钢筋埋件安装
5) pre-buried bolt sleeves installation
预埋螺栓套筒安装
1.
Combined with practice,according to the feature that there are many factors influencing the basis construction by coal pulverizer,it discusses the key points in coal pulverizer basis construction such as survey and setting out,steel bar project and its fixing frame installation,pre-buried bolt sleeves installation,and concrete project,so that the construction can meet the requirements of standard.
结合工作实践,针对磨煤机基础施工现场影响因素较多的特点,对测量放线、钢筋工程及其固定架安装、预埋螺栓套筒安装、混凝土工程等磨煤机基础施工要点作了论述,以使其施工满足规范要求。
6) Embedment and installation
埋设安装
补充资料:设备安装前的准备工作——设备的预装配与预调整
设备安装前的准备工作——设备的预装配与预调整 | ||
|
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条