2) Fund-raising Development Programme
集资发展方案
3) collection scheme
收集方案
1.
So that two sets of spatter collection scheme were designed.
设计了2套飞溅收集方案,第1种方案是采用无限平板法进行收集,第2种方案是采用封闭法进行收集。
4) integration project
集成方案
1.
Research on Business data integration project in TRS;
客票营销分析系统数据集成方案的研究
2.
A tight integration project of marine oil spill model with GIS is proposed.
文中介绍了GIS与溢油模型集成的概念,分析了GIS技术在海上溢油模型中的应用实例,给出了一种GIS与溢油模型的紧密集成方案,讨论了两者集成的发展趋势。
5) project-scheme combination
方案集
1.
During the development of the system,the relations and subordination between mining conditions of the deposit and mining method have been fully considered,fuzzy mathematics has been used to quantify relevant factors and certain concepts such as canonical feature vector and project-scheme combination,ect.
充分考虑了矿体开采条件与采矿方案的联系和隶属度 ,利用模糊数学对有关因素进行合理的量化 ,引入典范特征向量、方案集等概念 ,建立了合理的计算机优选模型 ,该模型在云锡松矿的采矿方案比选中得以应
6) integration solution
集成方案
1.
Research on integration solution of hospital information system;
医院信息系统集成方案研究
2.
In this paper,six integrating solutions are proposed and merits and defects of each integration solution are pointed out.
提出了六种集成方案 ,指出了每种集成方案的优缺点。
3.
Using multi-thread,Web Service and Batch technology, the article develops a new integration solution with order and spatial-temporal analysis as its center.
在对时空分析复杂性分析的基础上,重点研究MAGIS和订单服务模式的特点,借助于多线程、Web Service及Batch处理技术,制定了一套以订单和时空分析为中心的新的集成方案。
补充资料:集资
聚集资金:~经营。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条