1) lifting machine
吊装机械
1.
Because it has a very large size and little standard structural parts, its construction time was short and there are many construction difficulties, engineers adoped the high-level assembly construction method, proper lifting machines and scientific and reliable installation methods, and these measures ens.
本工程合理地进行吊装机械配置 ,选用科学可靠的安装方法 ,精心组织安排施工 ,保证了吊装进度和安装精度 ,取得了很好的社会经济综合效益。
2.
In this article, some high\|rise steel structural lifting methods, including choice of lifting machines, lifting method, measurement and correction of columns and beams, installment of high\|strengthen bolts, and welding of pegs of profiling steel boards, are introduced.
介绍高层钢结构吊装机械的选择 ,梁柱的吊装方法和测量校正 ,高强螺栓的安装 ,压型钢板栓钉的焊接。
2) hoisting machinery
吊装机械
1.
This paper discusses the design of concrete hardware for the monitoring and control system of large hoisting machinery based on embedded microprocessor development board EasyARM2200 and presents the software components and flowchart of programs.
采用嵌入式微处理器开发板EasyARM2200设计了大型吊装机械状态监控系统的硬件,给出了软件组成和程序流程图。
2.
Selecting and arranging hoisting machinery is one of the key tasks in boiler installation planning, which determines the difficulty and operability of hoisting, and construction schedule.
锅炉吊装机械的选择和布置是锅炉安装策划的一项重要工作,决定了吊装工作的难度、可操作性和工程进度。
3) the machine installation
机械吊装
4) mechanized derrick rig
机械化吊杆装置
5) fuel handling tool
燃料吊装机械
6) main hoisting machinery
主吊机械
1.
Selection and arrang ement of main hoisting machinery for 1000 MW USC coal firing unit turbine and boiler island constructions showcase the construction company s heavy equipment and its construction capability.
1000MW超超临界燃煤机组汽机与锅炉岛施工主吊机械的选择与布置充分体现了一个施工企业大型机械装备水平和施工能力。
补充资料:厂房钢结构组合吊装
厂房钢结构组合吊装
combined hoisting of steel structure for workshop building
采用组合吊装时,要结合结构型式,根据起重设备能力,保证安全、质量,提高作业效率的原则确定构件组合的范围。常用的组合形式有:(l)多节柱的组合,对H形框架结构也可采用柱与梁组合;(2)吊车梁与辅助析架的组合,将吊车梁、辅助析架利用制动板、水平支撑、垂直支撑进行固定,形成组合体;(3)天窗架的组合,将垂直天窗架与屋面、墙面擦条、天沟和支撑等进行组合;(4)墙面系统的组合,以墙皮柱作骨架,将其与墙面镶条、拉条和钢窗等组合在一起.(5)厂房屋面系统整体组合吊装,将2~3棍屋架,与屋架间上下弦的水平支撑、垂直支撑、屋面镶梁、天沟及天窗等全部构件组合成整体进行吊装。 组合吊装一般选用大型塔式起重机或履带式起重机。吊装前要对起重设备和组合构件进行验算,包括:(1)起重机的起重能力(包括起重量、回转半径、起重高度等)复核;(2)组合件整体稳定和局部稳定验算;(3)吊点处局部变形验算和吊点距离计算;(4)提升用绳索和吊具验算。验算结果全部符合技术要求后,方可进行吊装。 (刘庆华)ehangfang gang」旧gou zuhe dlaozhuang厂房钢结构组合吊装(eombined hoisting ofsteel strueture for workshop building)将部分单体构件预先在地面上组拼成整体后,用起重设备提升到设计位置上的作业。这种方法比单体吊装可大量减少高空作业,节省大型起重设备的台班费用,有利于保证结构节点的焊接质量。但施工准备时间较长,结构组合几何精度控制较复杂,并需选用有较大提升能力的起重设备。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条