1) rope tower column
索塔柱
2) tower column
塔柱
1.
Construction technology of Haicang bridge s west tower column;
厦门海沧大桥西塔塔柱施工技术
2.
Cable-stayed spatial grid, which has many advantages, is a type of hybrid structure composed of tower columns, suspended cables and spatial grids.
斜拉空间网格结构是塔柱、斜拉索和空间网格协同工作的杂交结构,刚柔相济,受力合理。
3.
There are big area of tower columns and high column shaft with complex structure in the con-struction of Guangdong Olympic Stadium.
广东奥林匹克体育场塔柱面积大、柱身高、结构复杂,施工中采用移置组合钢模板施工工艺,混凝土浇筑成型后,表面平整光滑,达到清水混凝土效果,塔柱垂直度偏差控制在15mm内,且操作方便,降低了施工费用。
3) pylon
[英]['paɪlən] [美]['paɪlən]
塔柱
1.
The main bridge of Fumin Bridge in Shenyang is a prestressed concrete cable-stayed bridge with double kinked column pylons and single cable plane.
富民桥主桥为折线形双塔独柱式单索面预应力混凝土斜拉桥,针对该桥单索面、折线形塔的特点,通过运用能量法对成桥后塔柱的横向稳定问题进行分析,验证了结构设计的安全性。
2.
The research is based on an engineering design of a cable-stayed bridge with concrete filled steel tube pylon.
结合一座钢管混凝土塔柱斜拉桥的工程设计 ,采用空间梁 -板结构模型 ,分析了结构的基本动力特征 ,并选取El -Centro波进行桥梁地震作用时程分析 ,给出主梁和塔的主要内力和位移响应。
4) tower
[英]['taʊə(r)] [美]['tauɚ]
塔柱
1.
Design and research of structural system of tower-cable-pipe truss
长春经济开发区体育场塔柱-拉索-大跨度钢管桁架结构设计研究
2.
5 and eigenvalue buckling method, the numerical value of upper limit of the supporting tower is got when it becomes unstable.
5软件 ,先用特征值屈曲方法求得供料线塔柱失稳载荷的数值解上限 ,然后以该上限作为非线性屈曲分析的给定载荷施加给供料线塔柱 ,在渐进加载达到此载荷前 ,求得塔柱非线性失稳临界解 ,同时给出载荷位移曲
3.
New Bayi Bridge is a askew-pulled bridge with two towers,which is one of the main passages linking up the north and south of Ganjiang in Nanchang municipality.
本文论述了该桥主塔基础、塔柱和桥面变形监测的精度设计、作业方法及变形监测基础数据建立的做法。
5) tower
[英]['taʊə(r)] [美]['tauɚ]
塔,柱
6) cable tower
索塔
1.
Model test of the mechanical property of the cable tower of Liede Bridge and the theoretical analysis
猎德大桥索塔力学性能模型试验及理论分析
2.
The cable towers incline in axial direction and have angulated 70 degrees with ground line.
湖北省孝襄高速公路孝南互通A、B匝道斜拉桥为独塔无背索弯坡斜拉桥,索塔在顺桥向倾斜与地面线成70°角,斜塔柱采用爬模爬架施工。
3.
According to the concrete structure of cable towers of Great Donghai Bridge,authors state construction methods of climbing scaffoldings used in construction of cable towers,and introduce winter construction situation of marine concrete of cable towers.
以东海大桥索塔混凝土结构为背景,介绍了索塔施工爬升排架施工工艺以及索塔海工混凝土冬季施工情况。
补充资料:鳌柱塔
鳌柱塔原是招宝山十二景之一景。即“鳌柱插天”。则于历史原因,原鳌柱塔早已损毁无存。为恢复这一历史遗迹,镇海历届领导在筹资方面做了很多工作。
新建鳌柱塔坐落在招宝山北峰顶上,其下面南坡上屹立的便是观音阁圣地。
鳌柱塔由侨胞捐资和政府拨款共同建设,花资约600万元。由天津大学规划设计。主体工程自1995年5月破土动工,1998年10月竣工,管理房等附属工程1999年春节前完工,当年春节正式开放接待游客。
鳌柱塔占地361平方米,为仿宋建筑,钢筋混凝土框架结构,锚岩桩基础,按抗震抗台规范设防,塔身净高57.6米,七层八角,青铜塔刹顶,塔内除设有步行步阶外,还设有电梯,方便年老游客。
鳌柱塔是镇海口的制高点,登塔远眺,望海观潮,领略海天风光,东海诸岛若隐若现.俯视城镇乡村、炼油厂、镇海发电厂、北仑港码头尽收眼底;镇海城镇乡村,历历在目;宁波市区现代化港口城市隐约可见;逶迄曲折的甬江彩带把宁波、镇海连起来。 文字
说明:补充资料仅用于学习参考,请勿用于其它任何用途。