1) synthetic risk rate
综合风险率
1.
And based on the theory of Poisson point process, a calculation model of synthetic risk rate is given.
提出了防洪风险分析中一个Poisson标值点过程模型 ,并运用Poisson点过程理论 ,给出了综合风险率的计算模型 。
2) Total Risk-adjusted Return
综合风险收益率
3) comprehensive risk
综合风险
1.
Variable fuzzy sets and their application to comprehensive risk evaluation for flood-control engineering system;
模糊可变集合及其在防洪工程体系综合风险评价中的应用
2.
"Risk Government" originates from the international background of risk society and our country s condition that comprehensive risks become more and more.
"风险政务"的提出源自于风险社会的国际背景和我国转型期综合风险膨胀的国情。
3.
Considering the problems of slow convergence speed and local minimum existing in the BP algorithm, chaos theory in combining with artificial neural network is used to structure chaos learning algorithm and to establish a new comprehensive risk evaluation model based on Chaos Neural Network.
针对神经网络在搜索寻优过程中存在的收敛速度慢、易陷入局部极小值这一问题,将混沌理论和神经网络有机结合,构造混沌学习算法,建立了基于混沌神经网络的综合风险评价模型,该模型充分利用混沌运动的遍历特性,加快了训练速度,使其收敛于全局最优解。
4) integrated risk
综合风险
1.
A suggestion on construction of integrated risk management system in China;
对中国综合风险管理机构体系建设的建议
2.
Design of integrated risk distribution mechanism of construction diversion system;
施工导流系统综合风险分配机制的设计研究
3.
Structure and evaluation of integrated risk for flood disaster(Ⅱ)——microstructure;
洪灾综合风险结构与综合评价方法(Ⅱ)——微观结构
5) Integrated Measurement of Interest Rate Risk
利率风险综合度量
6) comprehensive risk ratio
综合风险比
补充资料:风险补偿率
风险补偿率:风险越大,投资者要求有更高的风险补偿率(p),在实际工作中,风险补偿率的高低,在很大程度上也是企业参照市场情况主观规定的。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条