1) holding-standing pole
倒落式人字抱杆
2) inverted holding poles
倒落抱杆
1.
For construction of complete pole-tower with inverted holding poles the determination of hoisting points is a very important design content.
倒落抱杆整立杆塔施工中 ,吊点位置的确定是一项非常重要的设计内容。
3) grounded lifing pole
落地式抱杆
4) integral construction by means of reverse lifting poles
倒落抱杆整立施工
5) Ground mounted derrick
落地抱杆
6) ground rocker pole
落地摇臂抱杆
1.
On the basis of drawing on the technology and experiences of tower assembling and erection for 500kV and 750kV transmission lines in China,such methods suitable to the tower assembling for UHV transmission line as inside suspension pole with outside pulling wires,ground rocker pole and tower crane are adopted and applied in UH.
文章在借鉴我国500kV和750kV架空输电线路组塔施工技术和经验的基础上,提出了内悬浮外拉线抱杆组塔、落地摇臂抱杆组塔、塔式起重机组塔等适合于特高压线路铁塔组立的方法。
补充资料:倒字
1.谓唱戏不辨尖团音而误读。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条