Furthermore, the essence of the large deformation occurrence about weak rockmass tunnel under high initial in situ stresses is discussed.
运用非线性数值模拟大变形的手段 ,针对二郎山公路隧道在高地应力条件下软弱围岩的大变形进行了研究 ,进而探讨了大变形破坏的本质问题。
2) stress condition
应力条件
1.
Therefore, the stress condition, stress discontinuity value & position of the stress discontinuity line on the slip line field theory for geo-technical.
根据非特征线应力边界条件的显示解析表达式 ,明确给出了岩土材料滑移线场理论中应力间断线上的应力条件、应力间断值及其位置 ,使得锐角楔体极限荷载等问题的求解更简单、更方
2.
Based on the generalized non-linear strength theory and Satake\'s stress condition in plane strain state,the theoretical calculation formula of strength parametersφ_(PS),c_(PS) is proposed.
根据佐武提出的平面应变条件下的应力条件,本文推导了基于广义非线性强度理论的平面应变强度参数φ_(PS)、C_(PS)的理论计算公式。
3) Soil fertlity
地力条件
5) high geo-stress
高地应力
1.
Research of diamond weak combined bit for high geo-stress stratum drilling;
弱包镶金刚石钻头在高地应力地层中的应用研究
2.
Dynamic emulation analysis on tunnel excavating effect in high geo-stress zone;
高地应力区隧洞开挖效应动态仿真分析
3.
Xiabandi Water Control project is located at Pamirs,near an active seismic zone and within a high geo-stress area;for which the maximum embedded depth of the power tunnel is up to 1 400 m with the problem of high geo-stress.
下坂地水利枢纽地处帕米尔高原,临近地震活动带并处于高地应力区,引水隧洞的最大埋深达1 400 m,高地应力问题较为突出。
6) high ground stress
高地应力
1.
Destruction characteristic analysis of rock mass under high ground stress
高地应力下岩体的破坏特征分析
2.
Through site investigation and relevant study,the roadway deformation characteristic and the cause,the factors of inflencing roadway stability,and the instability model of Jinchuan high ground stress roadway were analysed in this paper.
通过现场调查及相关研究,本文分析了金川高地应力碎胀蠕变岩体巷道围岩的变形破坏特征、巷道变形破坏原因、影响巷道稳定性因素以及巷道失稳模式。
3.
Due to the complexity of occurrence condition and the polytropy of influencing factors,the excavation and supporting in soft failure roadway under high ground stress become very difficult.
高地应力破碎软岩巷道,由于赋存条件的复杂性和影响因素的多变性,使得该类巷道的开挖与支护极为困难。
补充资料:527.7高地南无名高地战斗
527.7高地南无名高地战斗
Height 527.7, Battle of a Nameless Height South of
527.2 GQodiNanwumingGao由ZhQndou5 27.7高地南无各高地战斗(Height527.7,Battle ofaNamelessHeightsoLltht)f)杭美援朝战争1953年夏季反击战投第三次进攻中,中国人民志愿军第16军为配合余城方向作战,以第46师第、36团进攻5277高地南无名高地。该高地位千金化西北10公里是美军第2师防御前沿的重要支撑点,由该师第38团1个加强连防守,筑有地堡、盖沟,并设有多层障碍物n第13石团于进攻前,进行了现地侦察和临战训练,在冲击出发地区秘密地构筑了能隐蔽1个连的防炮洞犷并组织炮火摧毁了美军阵地的大部工事和部分障碍物。7月17日21时40分,第136团第9连在左、右翼助攻分队的掩护下,从屯兵坑道进入防炮洞内22时30分,第136团开始炮火急袭。22时35分,第9连发起冲击,突人美军阵地后,采取小群多路的战术,打炸地堡,搜歼美军,至22时56分,将美军1个加强连全歼。随后在炮火支援下,打退了美军1个连兵力的两次反扑。23时20分,主动撤出战斗。18日晨,美军第2师以荷兰步兵营第1连和师〔兵营2个班复占该阵地。19口21时20分,第136团以第10连再次向该阵地发起攻击,经半小时激战,将守军大部歼灭,接着连续打退美军2个连的三次反扑,于23时30分撤离阵地。此战,第136团共毙伤俘美军、荷兰军450余人,自己伤亡140余人。 (肖后群)