您的位置:首页 -> 词典 -> 多缺陷桩
1)  multi-defective pile
多缺陷桩
1.
Dynamic axial response of multi-defective piles in nonhomogeneous soil;
不均匀土中多缺陷桩的轴向动力响应
2)  defective pile
缺陷桩
1.
It is common that some of pile foundations contain defective piles in engineering of pile foundations; The usual form defect of piles include the party rupture of piles, the party enlarged of piles and the party necked-in of piles, etc.
缺陷桩的出现在桩基施工中往往是很常见的;桩身常见的缺陷形式一般包括桩身局部断裂,桩身局部扩径,桩身局部缩径等。
2.
It is common that some of pile foundations emerge defective piles in engineering of pile foundations; The usual defect forms of piles include the party rupture of piles, the party hole enlarged of piles and the party necked-in of piles, etc.
缺陷桩的出现在桩基施工中往往是很常见的;桩身常见的缺陷形式一般包括桩身局部断裂、桩身局部扩径、桩身局部缩径等。
3.
Some tested curves of defective piles are studied and verified after piles are dug.
应用该仪器进行桩的工程检测,研究其特性,并对工程桩的几种缺陷桩实测曲线进行研判及开挖验证。
3)  defect in pile body
桩身缺陷
1.
Lead on to the defect in pile body of bored caisson pile, mainly relate to wall mud, boring drill rate, 3 materials of concrete (cement, sand,stone), water cement ratio and mixing quality controlled by concrete under water when pouring, self defect of pouring conduit, and operation way heighten conduit, and so forth.
导致钻孔灌注桩桩身缺陷,主要与护壁泥浆、成孔钻速、组成砼的三大材料(水泥、砂、石子)、在灌注时水下砼控制的水灰比及搅拌质量、灌注导管的自身缺陷、以及提升导管的操作方式等有关,根据一些工程实例,分析了形成桩身缺陷的具体原因,并提出了防范措施。
4)  defective piles
缺陷桩
1.
Three-dimensional finite element analyses of the behavior of pile foundation with defective piles under vertical loadings;
含有缺陷桩的桩基础竖向承载性状的三维有限元分析
5)  defect pile
缺陷桩
1.
The numerical calculating method for defect pile in bridge engineering;
桥梁工程缺陷桩数值计算方法
2.
According to the construction method of bridge cast-in-place bored pile in this paper based upon introduction of several possible accidents and defect piles may be encountered in construction their causing reasons are analyzed; at the same time corresponding control measures are proposed.
针对桥梁钻孔灌注桩的施工方法 ,介绍了在施工过程中可能产生的钻孔事故类型及缺陷桩种类 ,并对其产生的原因作了分析 ,提出了具体的处理措施。
6)  defect pile-foundation
缺陷桩基
1.
The defect pile-foundation, which was treated by using the jet grouting technique, was tested to be qualified after the treatment.
采用旋喷压浆技术对缺陷桩基进行了处理,处理后检测合格。