1) large power station
大电厂
2) large power plant
大型电厂
3) Daba power plant
大坝电厂
1.
This paper considers comprehensively concerned data of geology and geophysics within250 km around the Daba power plant and establishes a 3-D finite element model.
本文综合考虑了宁夏大坝电厂周围250km范围内的地质、地球物理方面的有关资料,建立了三维有限元模型。
5) large capacity power plant
大型火电厂
1.
Based on pseudo static test, seismic behavior of the RC shear wall with boundary columns in the large capacity power plant’s main factory building has been studied.
通过对某大型火电厂主厂房纵向框架-剪力墙模型结构进行的伪静力试验,研究了此类工业厂房中纵向带边框柱剪力墙结构的抗震性能问题,并采用宏观有限元方法将这种剪力墙模型结构简化为一个多垂直杆模型,通过将竖向弹簧杆元放置在Gauss积分点处,不仅可以模拟出剪力墙结构的滞回曲线、骨架曲线以及延性等性能,还明显提高了计算效率。
2.
C shear wall with frame column is discussed through model experimentations and finite element methods in this paper, after taking frame-shear wall structure of a main factory building of the large capacity power plant as experimentative prototype.
本文以某大型火电厂主厂房纵向框架一剪力墙结构为原型,通过模型试验和有限元分析,研究了纵向带边框柱中高剪力墙结构的抗震性能问题,主要内容有: 选用1/15缩尺比把某大型火电厂主厂房纵向带边框柱剪力墙原型结构模拟为一个模型结构,并进行了伪静力试验,研究了这类纵向带边框柱中高剪力墙结构的开裂与破坏过程、骨架曲线、刚度退化、延性性能等问题,试验滞回曲线饱满,消能能力强,说明此类中高剪力墙的抗震性能较好。
6) large hydropower plant
大型水电厂
1.
As for the frequent regulation of automatic generation control(AGC) units,the method,that many AGC units are dispatched to respond to a tiny fluctuation of the random load for economy,is not necessarily reasonable especially for a large hydropower plant.
AGC机组调节比较频繁,如果仅考虑经济性而调用大量机组去响应并非特别大的随机负荷调整是不尽合理的,尤其是对机组台数众多的大型水电厂,不仅经济上得不偿失,而且会带来安全隐患。
补充资料:《大电厂技术协会会刊》
《大电厂技术协会会刊》
VGB Kraftwerkste-chnik
Da DlonehangJ一shuX}ehul Hu一kan《大电厂技术协会会刊》(VGB KrajZ切erk-stechnt’k)创刊于192。年,德文月刊,12开本;从1988年开始增加了英文版季刊;由德意志联邦共和国大电厂技术协会编辑出版。编辑部地址:德国埃森,Postfaeh 103932,Klinkestra份27一31,仆4300 Essen传真:(0201)8128一302. 该刊是发电技术专业期刊,主要刊载火电和核电的设备设计、施工、运行、试验技术的综述和学术论文,以及发电专业会议简报、学会论文简介、人物介绍等.每年均刊出一次大电厂技术协会年会论文专辑。 该刊的读者对象是火力发电设备制造、电力工业等部门的科技人员和管理人员。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条