1) Long piles and short piles
长桩与短桩
2) long-short pile
长短桩
1.
Analytic method of pile displacement in long-short pile group subjected to vertical loading;
竖向受荷长短桩基础的位移分析方法
2.
The stresses of long piles,short piles and soil were measured by the tests in situ on the bearing characteristics of cement-soil long-short piles composite foundation in deep soft soils;pile-soil stress ratio of composite foundation with cement-soil long-short piles and its variation rule with the load were studied in deep soils.
通过水泥土长短桩复合地基承载特性试验,实测长桩、短桩和桩间土顶面应力,探讨了采用水泥土长短桩方法对深厚软土进行处理时,复合地基桩土应力比及其变化规律。
3.
The mechanism between load and displacement of long-short pile foundation with end-bearing long-piles can be comprehended profoundly.
针对端承长桩下长短桩桩筏基础这一新基础类型,运用三维弹塑性有限元方法数值模拟了外荷载分级施加过程中,基础中长桩、短桩以及垫层的荷载和位移变化曲线以及长短桩之间荷载的分担关系,从而有利于更深刻地理解端承长桩下长短桩桩基础的受荷与变形机理。
3) long-short piles
长短桩
1.
Experimental study of long-short piles composite foundation in deep soft soils;
深厚软土中长短桩复合地基试验
2.
Analysis of design project of long-short piles foundation of an engineering;
某工程长短桩组合桩基础设计方案分析
3.
Cement mixing piles are put into the interval of pipe pile to form composite foundation long-short piles.
在管桩间设置水泥搅拌桩,加大管桩间距,同时使桩间土的承载力适当提高,形成长短桩复合地基。
4) long and short piles
长短桩
1.
Application of foundation with long and short piles to chimney of a power plant;
长短桩组合桩基础在某电厂烟囱工程中的应用
2.
Work mechanism of long and short piles composite foundation and its application
长短桩复合地基工作机理及其应用
3.
In view of the effective working lengths of pile bodies in ground treatment,an analysis is carried out on the work mechanism of long and short piles.
基于桩体在地基处理中的有效工作长度对长短桩的工作机理进行了分析。
5) long-short pile foundation
长短桩
1.
Research on deformation character of long-short pile foundation and long pile foundation in Wenzhou;
温州地区长短桩桩基与长桩桩基变形性状的研究
6) D-M method
长板–短桩
1.
Numerical analysis of improved deep soft foundation for highways by use of D-M method;
长板–短桩工法处理高速公路软土地基的数值分析
补充资料:心长绠短
1.喻力不从心。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条