1) comprehensive control of auxiliary shops
辅助车间综合控制
1.
Taking Shantou Power Plant as an example, this paper expounds the working philosophy of ash handling system, ash handling control and the comprehensive control of auxiliary shops in thermal power plan
以华能汕头电厂为例 ,阐明火力发电厂除灰系统、除灰控制以及全厂辅助车间综合控
2) control network of auxiliary shop
辅助车间控制网络
3) auxiliary workshops
辅助车间
1.
The auxiliary control network serving for whole plant has realized the center control of all auxiliary workshops in Wangtan Power Plant,and the local unattended goal in auxiliary workshops.
王滩发电厂的全厂辅控网实现了全厂辅助车间的集中控制,实现了辅助车间就地无人职守的目标。
2.
According to the characteristics of auxiliary workshops in power plant and the conventional distribution control method, an integrated supervisory control system is proposed.
针对大型发电厂辅助系统各自独立信息不能共享、运行人员重复配备的状况,结合辅助车间监控系统的特点和实际,根据工业以太网及通信相关原理,设计了具有高传输速率、可靠性、抗干扰性和易扩展性的辅助车间集中监控网络。
4) auxiliary workshop
辅助车间
1.
The paper introduces present situation of auxiliary workshop control system in the thermal power plant, and compares industrial Ethernet network and standard Ethernet network.
介绍国内大中型火力发电厂辅助车间控制系统的现状,在分析比较标准以太网和工业以太网异同的基础上,提出了嘉兴电厂辅助车间集中监控系统的总体设计方案,总结了实现辅助车间集中监控的关键技术。
2.
In this paper,the new direction about power plant’s automation design was discussed in system from several sides as follows: the control room and control mode progress,the integration of DCS,the control scheme for auxiliary workshop,the video supervisory system and so on.
从控制室及控制方式发展趋向、DCS功能向一体化发展、辅助车间控制系统方案和趋势以及工业视频监控系统等方面,阐述了火电厂自动化设计发展的新趋势。
5) assistant workshop
辅助车间
1.
This Article analyzed the assistant control network consists of program control system of all assistant workshop,including coal-transmission,dust-clearing,chemical water and Flue Gas desulfuri -zation,It realized the control project of main control room for every assistant control system.
探讨分析了输煤程控、除灰程控、化水程控、烟气脱硫程控等所有辅助车间控制系统组成一体化全厂辅控网系统,实现在主控室对各辅控系统设备的控制方案,并通过事例介绍了辅助车间采用统一DCS系统组成的全厂辅控网系统。
6) BOP
[英][bɔp] [美][bɑp]
辅助车间
1.
The research on BOP centralized control of thermal power plants
火电厂辅助车间集中控制方案研究
2.
Research and implementation of technical solutions for BOP centralized control network of thermal power plants
火电厂辅助车间集中控制网络技术方案研究与实施
补充资料:复杂金精矿冶炼厂综合回收车间设计
复杂金精矿冶炼厂综合回收车间设计
design of synthetical recovery plant for complex gold concentrate smelter
fuZa Jinjingkuang yelianChang Zonghe huishouehelian sheli复杂金精矿冶炼厂综合回收车间设计(de-sign of synthetieal reeovery plant for eomplexgold eoneentrate smelter)以来自焙砂浸出车间的酸浸液和盐浸液为原料,经过处理,回收铜和铅的复杂金精矿冶炼厂车间设计。酸浸液中的铜、锌含量随金精矿中的铜锌含量而波动,一般的变化范围为:铜6~189/L;锌3~119/L;铁5~169/L;HZSO;4~59/L;单独回收锌并不经济,一般不回收。设计主要内容包括:工艺流程、设备选择、车间配置和技术经济指标。 工艺流程由酸浸液回收铜可采用萃取一反萃一电积法生产电铜,或采用置换法生产海绵铜。该法将含铜的酸浸液经换热器加温至40~50‘C,送入装有废杂铁块的置换器,溶液中的铜被铁置换成铜粉,流出后经浓缩脱水,获得含铜75%一B。%的海绵铜。置换法过程简单、投资省、成本低。 脱铜后液采用石灰中和,金属水解沉淀成为中和渣,与中和后液一齐排放到渣场。 从酸浸液中综合回收海绵铜的工艺流程见图。 硫酸浸出液人 污水 (排放) 酸浸液中综合回收铜的工艺流程示意图 由浸出车间来的含铅盐浸液中带有少量银,先用铅丝置换脱银,回收海绵银。再加硫化钠脱铅得铅精矿,脱铅后的食盐溶液送盐水蒸发工序,浓缩至接近饱和状态,返回盐浸使用。 设备选择置换用的设备有多种形式,如矩形槽废铁置换器、铁屑置换机械搅拌槽、立式锥形废铁置换器、铁粉流态化置换器和水平式转鼓置换器等。后者类似湿式球磨机,内有防腐衬里,可连续作业,是专为黄金冶炼厂设计的新设备。 海绵铜一般采用离心机或水平带式过滤机过滤。 中和槽和脱铅槽均采用机械搅拌槽,内有防腐衬里。 车间配置酸浸液的加温和置换配置在厂房的一端,另一端为中和槽及脱银、脱铅槽。 水平式转鼓置换器的安装位置要高出二层楼面,使海绵铜浆液借助于重力自流输送,但设备基础须建于地面,以避免震动影响厂房安全。此处的地面及基础外部均须做防腐处理。 技术经济指标主要技术经济指标为: 酸浸液含铜/g·L一‘6~8 置换尾液含铜/g·L一‘0.01 置换率/%>99·5海绵铜成分:Cu/%75~80 Fe/%5~10每吨铜废铁块消耗/t2~3每吨铜石灰消耗/t一6 (张永福)
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条