说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 高坝岩基
1)  high dam rock foundation
高坝岩基
1.
For high dam rock foundation intersected by inversely dipping discontinuities such as shear zones,faults,joints,etc,it is generally considered that its deep sliding mode is wedge sliding along the weak planes.
对于含反倾结构面的高坝岩基,一般认为其深层滑动模式为沿反倾结构面的楔形体滑动。
2)  high dam foundation
高坝坝基
1.
Analysis of dynamic effect characteristic for high dam foundation under earthquake load;
地震荷载作用下高坝坝基的动力响应特征分析
3)  rock foundation of dam
岩质坝基
4)  rock mass of dam foundation
坝基岩体
1.
The rock mass of dam foundation of Zaoshi Hydroproject is mainly fine silicarenite with soft layers.
皂市水利枢纽坝基岩体主要为石英细砂岩夹软弱夹层。
5)  karst cavities in dam foundation
坝基岩溶
1.
New technique of borehole comprehensive geophysical exploration used for detectingkarst cavities in dam foundation and effect of screen grouting quality in Geheyan project satisfies the re quirments of engineering geology and design departments.
采用钻孔综合物探新技术,探测隔河岩工程坝基岩溶并对大坝帷幕灌浆质量进行检测,满足了工程地质及设计、施工部门的要求。
6)  mother rock of dam shoulder
坝肩基岩
补充资料:岩屋坝

岩屋坝

Iwaya Dam


概  述

  岩屋坝位于日本岐阜县益田郡金山町、木曾川水系(Kisogawa)飞驿川的支流马濑川上。粘土心墙堆石坝,最大坝高127.5m,水库总库容1.735亿m3。马濑川No.1抽水蓄能电站最大装机容量28.8万kW。工程目的为防洪、灌溉、供水和发电。1973年2月开工,1975年11月主体工程完工。电站于1976年6月投运。
  坝址两岸岸坡约35°。坝址基岩为石英斑岩、玢岩等。玢岩呈宽2~10m的岩脉,呈黑色,一般较坚硬,左岸400m高程以上,由于风化作用,使岩质变软。玢岩岩体中有几条破碎带。坝址区不存在活断层。坝址上、下游方向有四条明显的破碎带。右岸上游侧有约20万m3的河岸阶地及岩锥。在填筑大坝前须先挖掉。
  坝址控制流域面积1034.9km2,多年平均流量29.5m3/s,水库面积426hm2。有效库容1.5亿m3,防洪库容0.5亿m3。正常洪水流量2400m3/s,设计泄水流量2900m3/s,非常洪水流量3500m3/s。
  建筑物包括大坝、溢洪道及发电厂房。
  大坝坝顶长366.0m,坝顶宽10m,坝底宽568.75m,坝体积580万m3。左岸设有陡槽式溢洪道,右岸有取水设备和泄水管等附属设施。
  溢洪道泄流能力为4000m3/s(特大洪水流量加大1/10)。设置2扇宽10.9m,高18.3m的弧形闸门,闸门用电子计算机操作。
  马濑川No.1抽水蓄能电站为混合型抽水蓄能电站,额定水头50~105m,装设2台水泵水轮机,单机出力14.9万kW。
  坝体总开挖量582万m3。土石方的最大填筑强度为3.25万m3/d。采用1条4m×9m的隧洞导流。

说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条