1) PB
项目缓冲区
2) projects
项目
1.
An analysis on advantages and disadvantages of developing forest carbon sequestration projects in China;
在我国开展林业碳汇项目的利弊分析
2.
On the post-construction management of agricultural comprehensive development projects in Ningxia;
关于加强宁夏农业综合开发项目建后管护的思考
3.
During the last two decades or so,the author has worked for the construction of aifferent copper and aluminum fabrication projects.
在对20年来铜铝加工项目的筹划和实施进行回顾的基础上,简要地进行了总结,谨供现在和未来铜铝加工项目的决策者和参与者参考。
3) program
项目
1.
On the safety management of construction project program;
浅议建设工程项目的安全管理
2.
On the cost management of government invested programs;
政府投资项目造价管理工作探讨
3.
On the inner cost control and steps of road bridge program;
浅谈路桥项目部内部成本控制及措施
4) project
项目
1.
Methods and Know-how for Improving Quality of CDM Project;
提高清洁发展机制项目质量的方法和技巧
2.
High Efficiency Renovation for Slab Casting Project;
板坯连铸项目的高效改造
3.
Suggestions of determination and construction on biodiesel projects;
关于生物柴油项目立项建设的几点建议
5) item
项目
1.
Discussions on the macro quality control of geological survey item;
论地勘项目的广义质量控制
2.
The work evolvement of “Reducing and Eliminating Items ”;
“降消项目”工作进展情况
3.
On management of constructing item;
浅谈建筑施工项目的管理
6) items
项目
1.
Design of Model Hierarchy Process on Priority Items of Natural Resources and Environment in The Yellw River Delta;
黄河三角洲资源环境优先项目层次分析模型设计
2.
Comparative Study of the Items, Objects and Efficacy of Maritime Liens;
船舶优先权项目、标的及效力之比较研究
3.
The paper studies on the items and results of electric experiment and its importance to safely running of small-sized power stations based on cases.
本文根据笔者多年来电气试验的实践经验,探讨了电气试验的项目内容、结果分析等方面,以及电气试验对小水电站安全运行的重要性。
参考词条
补充资料:HⅡ区和HⅠ区
见电离氢区和中性氢区。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。