1) Gravil-soil cushion
碎石土垫层
2) gravel mattress
碎石垫层
1.
To have a further study of the new type soft subgrade reinforcing system of geocell reinforced gravel mattress and gravel pile composite foundation of its mechanism of load capacity and settlement development,three comparative model tests were designed and carried out under the direction of similarity theory and similarity criterions deduced through dimension analysis method.
为深入研究土工格室碎石垫层-碎石桩复合地基这一新型多元复合地基加固体系的承载力和沉降变形机理,应用量纲分析法推导了土工格室碎石垫层-碎石桩复合地基模型试验的相似准则,根据相似理论设计和完成了3组具有可比性的模型试验,获得大量荷载-沉降、桩土应力比和应力分布数据。
3) gravel cushion
碎石垫层
1.
Corresponding calculation method and construction technique of gravel cushion for soft soil foundation treatment are briefly introduced.
结合具体的工程实践,对其工程地质和水文条件进行了分析,简述了碎石垫层处理软土地基的计算方法及具体的施工过程,实践证明,碎石垫层处理软土地基施工方便,工艺简单,质量易控制。
2.
Several methods are used are to test the physicomechanical indices of the gravel cushion.
某厂对其碎石垫层地基使用多种方法现场测试其物理力学指标,并作室内模拟试验。
4) crushed stone cushion
碎石垫层料
1.
The optimum gradation of crushed stone cushion for a concrete face rockfill dam is d 20 =0 25~1 5 mm, with a maximum grain size of 40~100 mm and a relative density of D r >0 7, containing 30%~60% in weight fine particles whose diameter is less than 5 mm.
混凝土面板坝碎石垫层料的最佳级配是d2 0 =0 2 5~ 1 5mm ,粒径小于 5mm的颗粒含量应在 30 %~ 6 0 % ,最大粒径为 40~ 10 0mm ,相对密度Dr>0 7,这时 ,碎石垫层料的渗透系数满足 (10 -3 ~ 10 -4 )cm/s数量级 ,且具有较高的抗剪强度 。
5) detritus soil
碎石土层
1.
After evaluation and analyses on the formation conditions and existing local experiences as well as new pile foundation technology, the load bearing layer of piles were courageously put on the detritus soil layer which is unconsolidated, character various greatly and bearing capacity low.
经对地层情况、本地区已有经验以及桩基施工新技术等进行分析评估,大胆地把桩端持力层放在结构松散、性质差异较大、承载力标准值偏低的碎石土层上,采用钻孔扩底灌注桩,以提高钻孔灌注桩的承载力,并运用后压浆技术对桩底及下伏地层进行加强处理。
6) granular cushion
级配碎石垫层
1.
Research on nonlinear property and granular cushion modulus of granular cushion asphalt pavement;
级配碎石垫层沥青路面非线性分析及模量研究
补充资料:单层厂房预制钢筋混凝土结构安装
单层厂房预制钢筋混凝土结构安装
installation of singlelayer precast reinforced concrete structure for workshop building
daneeng ehangfong yuzhi gangjinhunningtu JiegouanZhuang单层厂房预制钢筋混凝土结构安装(instal-lation of sidglelayer preeast reinforeed eon-eretestrueture for workshoP building)按设计与施工规范要求,将单层钢筋混凝土结构厂房的构件安装、固定到设计位置上的施工作业。构件组成包括柱、吊车梁、预应力析架(屋架及托架)和屋面板。由于构件单件较重,在受到撞击或不正常外力时易发生裂缝或断裂性损坏,因而安装时需合理地选择吊点,使用吊梁,保持起吊平稳,防止构件(特别是析架)发生抖动;禁止不正常施加外力(拉力、扭力等)强行搬转和矫正。安装方式通常分为单件流水作业和综合作业两种。前者是沿厂房全长先将柱列系统构件安装好,然后安装吊车梁,再安装屋盖系统构件;后者是将某一线的柱、梁、屋盖系统构件全部安装固定后,再安装下一线。在冶金工厂施工中多采用单件流水作业。在单层多跨钢筋混凝土结构厂房安装中,应确定中间部位一个净空较高、跨度较大的跨作为基准跨,该跨安装进度应比邻跨超前2~3线,以利合理地分配误差,避免公差积累。 安装准备除按一般厂房结构安装所要求进行的各项准备外,还应做好下列工作:(1)混凝土柱一般均在现场预制,预制场地需进行夯实,防止地基不均匀下沉而造成构件损坏。(2)析架组立、张拉及灌浆养护条件的准备。(3)拓架起吊平面外刚度的核算及必要的加固措施。(4)朽架吊点、吊梁及索具的选定。(5)预制柱翻转900,以增加柱在起吊时的抗弯能力。(6)析架间距调整器具的设计。 钢筋’混凝土柱的安装柱的起吊有旋转法(起重臂杆绕柱脚旋转而逐渐吊起的操作法)和滑行法(起重臂杆不旋转只提升吊钩的操作法)两种。柱的吊点一般设在牛腿下部。吊装时,按柱身离地面的竖直情况,分为垂直吊法和斜吊法石在起重机起重能力允许的情况下,应优先采用垂直吊法。采取斜吊法时,应用卷扬机和滑轮组拉住柱脚,用辅助主机将柱吊运至杯口。当柱重超过主机起重能力时,可采用双机抬吊。一般在柱子吊点处设有吊装孔,配备专门吊具(吊装轴)进行吊装。不设吊装孔的柱可用绳索直接绑扎吊装,但需采取保护柱棱角的措施,以防柱损伤。柱插入杯口后,应用缆绳及钢楔初步找正、固定,然后用经纬仪在柱相邻的两侧复测柱的垂直度,并量测牛腿的平面标高,确认合格后即可进行永久固定。 重型钢筋混凝土柱常采取分节吊装、高空组接的方法(上、下节柱的钢筋对焊或柱外壁连接板对焊)。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条