1) prestressed concrete bending component
预应力混凝土受弯构件
1.
By analysing the force of pre-stressed steel in prestressed concrete bending component,the change method of prestressed steel in prestressed concrete are introduced.
通过对预应力混凝土受弯构件的受力分析 ,提出了预应力混凝土受弯构件中预应力钢筋代换的基本方法。
2) concrete beam
混凝土受弯构件
1.
Critical reinforcement ratio of concrete beams reinforced by cold-rolled deformed steel bar;
冷轧带肋钢筋混凝土受弯构件的界限配筋率
3) flexural concrete member
混凝土受弯构件
1.
Study on the design method of CFRP sheets in strengthening flexural concrete members;
碳纤维布加固混凝土受弯构件的设计方法
4) prestressed concrete member
预应力混凝土构件
1.
Accurate calculation on stress range of reinforcing steel is important for fatigue life verification of prestressed concrete members.
通过6片同时配有钢绞线和HRB400级普通钢筋的后张有粘结部分预应力混凝土T型梁的试验,研究了疲劳荷载下预应力混凝土构件中预应力钢筋和普通钢筋之间应力分配的发展规律。
6) flexural beam member of concrete
混凝土受弯梁类构件
补充资料:混凝土构件预制
混凝土构件预制
prefabrication of concrete element
弦,以利于抽管顺利进行。振捣混凝土时严禁将振动器直接碰撞孔道芯管,以免管子偏位、变形、漏浆等现象发生。当采用蒸汽养护构件时,其最高温度不应大于95C。当混凝土强度达到能保证其表面、棱角不因拆模而受损坏,构件不因拆模而变形时,即可拆模。对设计允许移动拼装的构件,其底模可在混凝土达到设计强度标准值的75%时拆除;对于大型构件,其底模则需在建立预应力后方能拆除。 (4)张拉预应力筋之前,需对构件进行检查验收;对分块预制整体拼装的屋架,竖缝灌浆的强度须达到设计要求,锚具和端部埋设件接触处的焊渣和残存的混凝土要清理完毕;穿筋时将钢丝束或钢纹线束的一头打齐,顺序编号,以利锚具安装;预应力筋多采用液压张拉,分批对称加力,当达到设计要求的应力时,用专用锚具进行锚固。 (5)孔道灌浆应在预应力施加完毕、预应力筋锚固后随即进行,以防止预应力筋锈蚀。灌浆前要用压力水冲洗孔道,以便增强混凝土与灌浆料的粘结。灌浆材料主要采用水灰比为0.4的水泥浆,掺加少量对预应力筋无腐蚀作用的外加剂。灌浆设备常用挤压式灌浆泵。灌浆应缓慢均匀不间断地进行,浆体由下向上,从孔道一端向另一端流动,孔道中的空气由排气孔排出。在灌满孔道并封闭排气孔后,继续加压0.5一0.6MPa随即停泵,2一3min后封闭灌浆口。两端的锚具需用混凝土包覆严密,或涂刷防锈漆进行防腐。 (刘昌安高海空汤耀,+.)hunn旧gtu goul}on yuzhi混凝土构件预制(prefabrieation of conereteelement)将建(构)筑物的混凝土构件预先制成,以供现场组配安装的工艺。采用混凝土预制构件进行装配化施工,比采用混凝土现浇工艺可节省劳动力,克服季节影响,提高建筑效率,是实现建筑工业化的重要途径之一。第二次世界大战后,欧洲和前苏联较快地发展了此工艺,兴建了专业化的混凝土构件预制工厂。中国50年代初在长春、鞍山等地最先建立了附属企业性质的混凝土构件厂。“二五”期间,此工艺在全国得到普遍推广。 混凝土构件预制(包括普通混凝土构件预制和预应力混凝土构件预制)按作业地点不同分为现场预制和工厂预制两种方式。定型的,批量大的构件宜采用工厂预制方式;运输困难的大构件,体形特殊的少量构件,在施工现场具有经济、适宜的预制场地的条件下,可采取现场预制方式。 工厂预制混凝土构件和制品生产在专业的工厂中进行。主要产品有定型构件(如屋面板、空心楼板、墙板、屋面梁、吊车梁、柱、桩等)和大宗制品(如管、电杆、轨枕等)。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条