说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 混凝土面板胶结
1)  cementation of concrete face
混凝土面板胶结
2)  concrete face slab
混凝土面板
1.
Seepage configuration and calculation model for the concrete face slab with cracks;
堆石坝混凝土面板裂缝的渗流形态及计算模型
2.
Research on the concrete face slab temperature stress and the protective measures under the condition of temperature sudden drop;
气温骤降条件下混凝土面板温度应力及其保护措施研究
3.
Study on cracking control for construction of concrete face slab;
混凝土面板施工裂缝控制研究
3)  facing concrete
面板混凝土
1.
Due to operating for40years,it has many problems including part of curtain in dam foundation losing effectiveness, the integrality of facing concrete being weakened in some extent,stability agai nst sliding of some monoliths and lateral stability of counterfort retaining wa ll falling short of requirement of specifications in force.
大坝经过近40年运行,坝基帷幕部分失效,面板混凝土整体性遭受一定程度削弱,部分坝段抗滑稳定性、垛墙的侧向稳定性达不到现行规范要求。
2.
In the first phase of Wan anxi concrete face rockfill dam construction, facing concrete of 9100m2should be concreted.
万安溪面板坝一期面板混凝土总面积约9100m2。
4)  face concrete
面板混凝土
1.
Quality control of face concrete on dam of Jilintai Hydropower Station I;
吉林台一级水电站面板混凝土的质量控制
2.
quarry optimization and dam s face concrete construction time are concerned in this paper.
针对洞巴水电站工程施工中出现的两大主要问题:采石场优化问题和大坝面板混凝土施工时段问题,论述了决策的理由和结果,并总结已取得的成功经验。
3.
The test study of materials and its mix proportion provided reliable basis for quality control of mix proportion in placement of face concrete.
通过对面板混凝土原材料及配合比的试验研究,为面板混凝土浇筑过程中原材料、配合比的质量控制、混凝土拌合及浇筑中的质量控制,提供了可靠依据。
5)  concrete facing slab
混凝土面板
1.
Factors analysis and treatment of the moving-up failure of the concrete facing slabs of east sub-dam of Shahe Pumped Storage Power Station;
沙河电站东副坝混凝土面板抬动原因分析及处理
2.
After 5-year operation of Shahe Pumped-storage Power Station,we found several cracks on the concrete facing slab in the overhaul in 2005.
在2005年检查时发现大坝混凝土面板出现了若干裂缝,经过认真分析,确定采用灌浆和SR止水材料的处理措施,于2006年进行了处理。
3.
The concrete facing rockfill dam is a kind of the dam taking concrete facing slab as impervious body.
面板堆石坝是以混凝土面板作防渗体的坝型,如何控制面板裂缝的产生是混凝土面板施工的重要课题。
6)  slab concrete
面板混凝土
1.
Study on mix proportion design of slab concrete of Bailianhe hydropower station;
湖北白莲河抽水蓄能电站面板混凝土配合比设计研究
2.
Test and study on the slab concrete for the dam of Xiaoshan Hydropower Station;
小山水电站大坝面板混凝土的试验研究
3.
Cracking control on slab concrete of reinforced concrete slab rockfill dam for Halabula Reservoir;
哈拉布拉钢筋混凝土面板坝面板混凝土裂缝控制
补充资料:沥青混凝土面板坝


沥青混凝土面板坝
earth-rock dam with asphalt concrete facing

  1 iqing hunningtu mianbanba沥青混凝土面板坝(earth一roek dam withasphalt eonerete faeing)用沥青混凝土作上游防渗面板的土石坝。其组成部分有面板、坝体、垫层及下游排水等。沥青混凝土是沥青、矿粉、砂、石屑和小碎石的胶结物。加热至220℃左右经拌和后运到坝面,约达180℃,将其碾压密实。它不仅具有良好的防渗及适应变形的性能,且具有一定的水稳定性和热稳定性。1934年西德首先修建高12米的阿梅克沥青混凝土面板坝,该坝上游斜坡1二2,防渗层厚度6厘米。其后,这种坝得到了推广,据不完全统计,到20世纪70年代末已有23个国家修建了1百余座。奥地利高106米的欧申涅克坝是目前世界上最高的沥青混凝土面板堆石坝。中国于1974年修建高24.5米的辽宁12台子渣油沥青面板坝,其后10年共修建了这种类型的坝30余座。如陕西正岔水库坝高35米,上游边坡1二1.7,防渗层厚10厘米;北京密云县半城子水库坝高29米,系15厘米厚的沥青面板砂砾料坝,1976年建成后便经受了洪水、地震和持续2周一20℃低温的考验;陕西石贬峪水库坝高85米。 沥青棍凝土面板坝坝体采用重型振动碾碾压的堆石坝、砂砾石坝或石碴坝,可用图1所示沥青混凝土面板防渗,它的构造一般从表及里由封闭层、防渗层、整平胶结层及垫层等所组成,而防渗层又有简式断面(图2,a)和中间夹有排水层的复式断面(图2,b)两封闭层封闭层排水层整平胶结层整平胶结层图2沥青混凝土面板构造图图l沥青混凝土面板坝种。一般采用简式断面,重要工程采用复式断面。为便于沥青混凝土的摊铺,坝坡一般不陡于1二1.7,少数也有1:1.5一1:1.6的。防渗面板所用沥青的技术要求为:针入度40一80;软化点(50士4)℃;延伸度>60一100;与骨料粘附力等级4一5。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条