1) horizontal fracture pile
水平断裂桩
1.
The causes of formation of horizontal fracture pile are analyzed.
分析了水平断裂桩的形成原因,归纳了水平断裂桩的特征,结合典型中深部水平断裂桩工程实例,说明水平断裂桩的危害和检测的特殊性。
2) broken body of the pile
桩身断裂
1.
In connection with common accidents in constructive pr ocess of steel bar & concrete prefabricated pile,it analyzes cause of its accide nts from aspects of split on top of the pile?broken body of the pile?slippery or translocation of the pile & gush of the pile and puts forward concrete handli ng methods & preventive measures so as to be references.
针对钢筋混凝土预制桩施工过程中常见的事故,从预制桩桩顶破裂、桩身断裂、桩身倾斜或位移、成桩涌起等方面,对其事故发生的原因作了分析,并提出了具体的处理方法及预防措施,以供借鉴。
3) cracking sloping pile
断裂斜桩
1.
The practice shows that it is effective to remedy the loss of bearing capacity due to sloping piles by reinforcing cracking sloping piles,foundation caps and ground board together,with considering of the cooperation of upper-level structure-pile cap and ground board pile-earth.
实践证明通过对断裂斜桩及基础承台、底板的整体加固,并考虑上部结构———承台、底板—桩—土的综合共同作用来弥补因斜桩而造成的承载力损失是行之有效的处理方法。
4) broken pile
断裂桩
5) Zhuangnan fault zone
桩南断裂带
1.
Fracture features of Guantao to Dongying Formation in Zhuangnan fault zone, Gubei Subsag;
孤北洼陷桩南断裂带馆陶组—东营组断裂特征
6) left-handed strike slip
平移断裂
补充资料:暗桩
1.植立于水中而不露出水面的木桩。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条