说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 规划评论
1)  planning review
规划评论
2)  SEA [英][si:]  [美][si]
规划环评
1.
Study on Application of Economic Evaluation of Environmental Impact in SEA
环境经济评价在规划环评中的应用
2.
Based on SEA actuality of coal mineral zone,some impact forecast ways of atmospheric environment are offered on SEA of coal mineral zone,The Gauss-model of many pollution source and box-model are used in atmospheric environment impact forecast of YUSHEN coal mineral zone and SHENDONG coal mineral zone.
根据煤矿区规划环评的现状,提出了几种煤矿区规划环评中的大气环境影响预测方法,并将多源叠加的高斯模型法和箱模式法分别应用于榆神矿区和神东矿区的大气环境影响预测中。
3.
The confusion of the planning system will result in the chaos in land use and regional exploitation,and also has negative impact on the implementation of SEA in China.
规划体系的紊乱,是造成国土开发混乱的重要原因,客观上也不利于规划环评的开展。
3)  planning environmental impact assessment
规划环评
1.
Assessment method and index of sound environment in rail transit planning environmental impact assessment;
轨道交通规划环评声环境影响评价方法与指标
2.
The paper introduces the basic contents,the range,the principle and the assessment result of Jiaozuo mine area planning environmental impact assessment.
介绍了焦作矿区规划的基本内容,矿区规划环评的范围、原则和评价结果,指出了焦作矿区规划环评的创新性和规划环评对焦煤经济发展的指导意义。
3.
With the rapid expansion of the coal industry,China in the new round of coal mine construction over the recent years,The planning environmental impact assessment is even more important.
近年来,随着煤炭工业的快速扩张,我国迎来了新一轮煤矿建设高潮,规划环评的作用也更加重要。
4)  PEIA
规划环评
1.
Study on The Indicator System of PEIA for Chemical Industrial Park;
化学工业园区规划环评指标体系初探
2.
Plan Environmental Impact Assessment(PEIA) of coal mine area is a new work compared with other fields,therefore no technical guidelines can be followed;the assessment agents conduct the assessment work with various techniques and methods.
煤矿区规划环评在我国相对其他领域起步较晚,与之相适应的环评技术导则尚未出台,各评价单位采用的技术方法和思路较为混乱。
3.
For ensuring the PEIA to put into effect successfully, the PEIA technique guideline was issued by the Ministry of Environmental Protection of China in 2003.
国家环保部颁布的《规划环评技术导则》(试行)规定环境承载力分析是规划环评的基本技术方法之一。
5)  planning EIA
规划环评
1.
Characteristics of Urban Rail Transit Planning EIA and Difference with Project EIA
城市轨道交通规划环评特点及其与项目环评之区别
2.
The planning EIA is a new direction in the field of EIA in our country,and public participation is the very important part of the planning EIA.
规划环评是我国环评领域的一个新方向,公众参与是规划环评中的一个重要组成部分。
3.
With in-depth implementation of environmental impact assessment system,the scope of implementation has been transformed from project EIA to regional EIA and planning EIA.
随着环境影响评价制度的深入实施,其实施领域已由项目环评向区域环评和规划环评转变,评价内容也由广泛实施的预测评价向后评价和跟踪评价转变。
6)  planning evaluation
规划评估
1.
With Shenzhen as an example,this pa- per discusses the theory,method and framework of the urban immediate planning referring to previous studies of planning evaluation in academic field in an attempt to establish a comprehensive evaluation sys- tem of planning process,contents,implementation and mechanism.
以深圳实践为例,参考学术界有关规划评估的研究成果,针对近期建设规划特征,探讨近期建设规划评估的理念、方法与分析框架,尝试建立包括规划制订程序与内容、规划实施结果和规划实施机制在内的完整评估体系。
补充资料:城市总体规划与国土规划、区域规划的关系

国土规划、区域规划、城市总体规划是在不同层次、涉及不同地域范围的发展规划。国土规划、区域规划、城市总体规划组成一个完整的规划系列,国土规划和区域规划应当是城市总体规划的重要依据。而全国和区域性的江河流域、土地利用等专业规划则是国土和区域规划的重要组成部分,城市土地利用规划又是城市总体规划的重要组成部分。
我国的国土规划、区域规划以及江河流域规划、区域性土地利用总体规划等工作起步较晚,目前正在有计划、有重点地逐步展开,还没有法定的审批程序和审批成果。而全国绝大多数城市总体规划已经各级政府按法定程序审批,并在不断完善和深化,在实际工作中存在着相互联系和交叉的情况,因此本法原则确定应当相互协调的关系是必要的。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条