说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 给水过程
1)  water supply process
给水过程
1.
According to the dynamic characteristics of water supply process in circulating fluidized bed boiler (CFBB), a self setting intelligent PI+D controller is presented in which the setting strategy of second class parameters is adopted, thus, the control process is fast, accurate and smooth.
根据循环流化床锅炉经常带冲击负荷的给水过程动态特性 ,提出了一种自整定智能 PI+D控制器。
2.
Based on the dynamic performance of the steam drum water supply process of the boilers with lash load and the dynamic performance analysis, a intelligent PI+D controller is presented in this paper.
针对带冲击负荷锅炉汽包给水过程的特点 ,通过对给水过程动态特性的分析 ,提出了一种智能 PI+D控制器 ,现场运行收到满意效果。
2)  water supply project
给水工程
1.
Application of glass fibre reinforced plastic pipe in water supply project;
玻璃钢管在给水工程中的应用
2.
Selection of water supply pipe in water supply project
给水工程中供水管材的选用
3.
Application of the sinking pipe technology on water supply project crossing canal construction
沉管技术在给水工程穿越运河施工中的应用
3)  water supply engineering
给水工程
1.
Automatic system design of urban water supply engineering;
城市给水工程自动化系统设计
2.
In this article, authors introduce application technology and construction methods of PP-R pipe used in heating works and water supply engineering.
重点介绍了PP R管材在采暖工程和给水工程中应用时的应用技术及施工方法 ,以及施工中应注意的问
3.
Main points in design and construction concerning the large diameter nodular cast iron pipeline are described by means of Taiyuan water supply engineering from the Huanghe River.
介绍了大口径球墨铸铁管的主要性能特点 ,并通过黄河水源太原市城市给水工程 ,就大口径球墨铸铁管在设计与施工中的要点进行了论
4)  water-supply engineering
给水工程
1.
The planning and design of water-supply engineering in a certain large landscape recreation holiday district;
某大型山水休闲度假区给水工程规划与设计
2.
Design of anti-lightning system for water-supply engineering;
给水工程中防雷系统设计
5)  feed-water full-process
给水全程
1.
Key problems in drum boiler feed-water full-process control system is proposed by analyzing its structure.
汽包锅炉给水全程控制系统是火力发电厂单元机组主要的控制系统之一。
6)  water supply works
给水工程
1.
This paper makes comparison of and analysis on the features, special requirements for engineering applications and cost of common pipe materials used in water supply works, and puts forward some corresponding suggestions for selection of pipe materials and construction techniques.
对给水工程中常用管材的特性、工程应用的特殊要求及造价进行了比较分析 ,对管材选用和施工技术提出了相应建
2.
The status of water supply works planning in city planning is stated,andthe problem of planning deadline is discussed.
阐明了给水工程规划在城市规划中的地位,论述了规划的期限问题,提出了给水工程规划的要点及其规划方法。
补充资料:正规过程和倒逆过程
      讨论完整晶体中声子-声子散射问题时,由于要求声子波矢为简约波矢(见布里渊区),所得到的总波矢守恒条件会相差一个倒易点阵矢量G)。例如对于三声子过程有下列条件
  
  
     , (1)
  式中q1和q2是散射前的声子简约波矢, q3为散射后声子波矢,式(1)中G)的取值应保证q3也是简约波矢。这时会出现两种过程,其一是当q1+q2在简约区内时,可以取倒易点阵矢量G)=0,式(1)则简化为总波矢守恒条件,称为正规过程或N过程。其二是当q1+q2超出简约区时,所取G)应保证q3仍落于简约区内,由于q3与q1+q2相差G),显然q3位于q1+q2的相反一侧,这时散射使声子传播方向发生了倒转,故称为倒逆过程或U过程。U过程总波矢不守恒,但总能量守恒,因为声子频率是倒易点阵的周期函数,而q3与q1+q2只相差一个倒易点阵矢量。N过程在低温长波声子的散射问题中起主要作用。当温度升高,简约区边界附近的声子有较多激发时,U过程变得十分显著,它对点阵热导有重要贡献。
  
  在能带电子与声子散射问题中存在着与式 (1)相仿的总波矢条件
  k+G=k┡±q,
  
     (2)
  式中k与k┡分别为散射前后电子的简约波矢,±号分别对应于吸收或发射q声子。类似的在热中子-声子散射以及晶体中一切波的相互作用过程中,总波矢变化都相差一个倒易点阵矢量G),因此也都有N与U过程之分。这是晶体和连续媒质不同之处,连续媒质对无穷小平移具有不变性,才能求得总波矢守恒,而晶体只具有对布喇菲点阵的平移不变性,因此总波矢守恒条件会相差一个倒易点阵矢量。
  

说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条