说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 挖入式泊位
1)  indented birth
挖入式泊位
2)  Dug in
挖入式
3)  dig-in basin
挖入式港池
1.
Sedimentation calculation for surrounding basin and dig-in basin;
环抱式与挖入式港池的纳潮淤积计算
4)  excavated-in harbor basin
挖入式港池
1.
Study on the water exchange ability for the excavated-in harbor basin;
挖入式港池水体交换能力研究
2.
It is disadvantaged for the excavated-in harbor basin s water exchange flux which has large water area but only one mouth,and the linked fiver is a way to exchange the water from basin to the outside.
港池水域面积较大的单口门挖入式港池不利于港池水体与外界的交换,连通河涌是解决港池水体交换方式之一。
5)  excavated dock
挖入式港池
1.
Through the proof and comparison of many schemes of the layout,the combined scheme of excavated dock utilizing the deep water coastline of the front was adopted.
经过对港区总体布置的多方案论证和比选,采用了利用甸头深水岸线和挖入式港池相结合的方案,经过几年来的实践,取得了良好的效果。
2.
There exists universally reflow in the entrance of excavated dock, which is similar to approach channel of low head hydro-junction located in alluvial river.
挖入式港池口门附近普遍存在回流运动,与此类似的情况是冲积河流低水头枢纽的引航道。
6)  excavated dock basin
挖入式坞池
补充资料:泊位通过能力


泊位通过能力


  泊位通过能力在单位时间内(年、月)一个泊位所能装卸船舶运载货物的最大数量。它是确定港口通过能力的基础,也是安排港口生产任务的主要技术依据。一般以吨为计量单位。泊位是供船舶停靠和作业的位置,分为码头泊位、浮筒泊位和锚地泊位,而常指码头泊位通过能力。其通过能力大小主要取决于它所能停靠的船舶吨位等级、船型和作业条件,装卸货物的类别,码头机械设备数量、技术性能及其对货物的适应程度,以及生产作业组织水平、船舶到港的均衡状况和实际可作业的时间等多种因素。泊位年、月通过能力的测算公式为:泊位年通过能力(吨)泊位月通过能力X12装卸工作月不平衡系数泊位月通过能力(吨)3。·〔2二-每昼夜泊位非生产作业时间(小时)船舶一次装.一,‘:*L。,十训J丫卜业目丁!司船舶一次作业的辅助及技术作业时间(小时)(小时)或泊位月泊位装卸通过能船舶效率力(吨)(船时量)又抨旦夜伸悴x 装训J件山二目丁J旬(小时)泊位月实际装卸天数
  
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条