1) The Second Large Bridge over the Yangtse River in Najing
南京长江第二大桥
2) Nanjing No.3 Yangtze River Bridge
南京长江第三大桥
1.
Project Control Technology for Steel Tower Building of Nanjing No.3 Yangtze River Bridge;
南京长江第三大桥钢塔工程控制技术
2.
Research on the Cable Antiseptic System of the Nanjing No.3 Yangtze River Bridge;
南京长江第三大桥斜拉索的防腐系统研究
3) NANJING No.4Yangtze River Bridge
南京长江第四大桥
1.
This essay is to recount in brief insights and reckons of construction security of NANJING No.
本文根据交通建设工程的特点及风险分析与控制方法,针对南京四桥工程实际,浅谈加强南京长江第四大桥工程建设安全生产管理工作的思考和方法。
4) Nanjing Yangtze river bridge
南京长江大桥
1.
Monitoring the Structure Safety of Nanjing Yangtze River Bridge;
南京长江大桥结构安全监测
2.
The Historical Characteristics of Basso-relievos of Nanjing Yangtze River Bridge;
南京长江大桥浮雕的时代特征
3.
The superstructure of Nanjing Yangtze river bridge(NYRB)is steel truss and the piers stand on the pile foundations and caisson foundations.
建于1968年的南京长江大桥上部结构为钢桁梁,下部基础为桩基础和沉井基础,至今已安全营运37年。
5) the Second Nanjing Yangtze Bridge
南京长江二桥
1.
This paper presents the fatigue test research on the cable anchorage zone of the main girder of the Second Nanjing Yangtze Bridge.
本文针对南京长江二桥的索梁锚固结构,采用足尺模型进行了疲劳试验。
6) Changjiang River Bridge at Nanjing
南京长江桥
补充资料:南京长江大桥
在江苏省南京市下关与浦口之间。跨越长江的铁路、公路两用双层钢桁架梁桥。上层为公路桥,车行道宽15米,两侧人行道各宽225米;下层为双线铁路桥。正桥十孔,共长1577米,连同两端引桥总长:公路桥4589米,铁路桥6772米。正桥两端各有一对高达70米的桥头堡。1968年底建成通车,将原津浦、沪宁两铁路连接为京沪铁路。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条