2) integrated coal-gasification fuel cell combined cycle
整体煤气化燃料电池联合循环
3) combined cycle power plant
联合循环电厂
1.
General arrangement optimization of F class power island for large-scale natural gas -fired combined cycle power plant;
大型天然气联合循环电厂F级机组动力岛布置的优化
2.
Some problems and treatment of liquefied petroleum gas fuel system for combined cycle power plant;
联合循环电厂液化石油气燃料系统存在的问题及处理方法
3.
Noise control of natural gas-fired combined cycle power plant;
天然气联合循环电厂的噪声控制
4) combined cycle power generation
联合循环发电
1.
The gas discharge is decreased by adopting the combined cycle power generation with gas and steam,and the partial self-supp.
某钢铁企业调整煤气结构,建立煤气自动监控系统,提高转炉煤气回收量;采用煤气干法除尘和电除尘技术,提高煤气净化质量;采用高炉炉顶煤气余压回收透平发电实现了煤气能量的有效转换;采用燃气-蒸汽联合循环发电减少了煤气放散,实现了企业用电的部分自给。
2.
The article introduces the principle and process flow of gas and steam combined cycle power generation technology, illustrates the high efficiency, energy saving and low environmental pollution of the combined cycle power generating unit.
介绍了济钢燃气-蒸汽联合循环发电技术的原理和工艺流程,阐明了联合循环发电机组的高效性、节能性和低污染性。
3.
The paper introduces the technical features of heat and poer coneneration and combined cycle power generation systems using natural gas as fuel.
介绍了天然气做燃料的热电联产和联合循环发电系统的技术特征,根据总能系统原理梯级利用天然气燃料所产生的能量,达到较高的综合热效率。
5) IGCC
联合循环发电
1.
THE COMMERCIAL DEVELOPMENT OF INTEGRATED GASIFICATION COMBINED CYCLE (IGCC) IN WESTERN EUROPE;
西欧煤气化联合循环发电技术的工业开发
2.
This paper introduces the development of Shell coal gasification process and it sfirst commercial application——Demkolec project which was a IGCC power plant located at theNetherlands.
介绍了Shell煤气化工艺的发展及其第一个完全工业化的设施——位于荷兰的Demkolec的联合循环发电电厂。
6) combined cycle power plant
联合循环电站
1.
Thermodynamic analysis for LNG combined cycle power plants;
液化天然气(LNG)联合循环电站热力学分析
2.
This paper discussed application condition and characteristic of heat recovery steam generator(HRSG)with supplementary firing equipment and not,gave several layout programs of steam turbine cycle system ,analysed the method to choose steam cycle system and the mode of HRSG,thus provide references to construct large combined cycle power plant.
探讨了350 MW级燃气-蒸汽联合循环电站余热锅炉补燃与不补燃的应用条件及各自特点,给出了几种蒸汽轮机循环系统的布置方案,并分析了蒸汽循环系统的选择方法,对余热锅炉型式进行了分析比较,为大型燃气-蒸汽联合循环电站的建设提供参考。
3.
Through the tech-economic analysis of several specific projects,including their construction scale and estimated capital investment it is expounded that natural gas-fired combined cycle power plants require a relatively small capital investment and involve a shorter construction period.
通过若干工程实例的建设规模、投资估算和技术经济分析,阐明天然气联合循环电站的投资较小,建设工期短;但由于天然气价格相对较高,导致发电成本较高,盈利能力偏低,并得出天然气发电仍然需要政府适当扶持的结论。
补充资料:IGCC电厂(见整体煤气化联合循环电厂)
IGCC电厂(见整体煤气化联合循环电厂)
Aintegrated gasification combined cycle plant
IGCC电厂bined eyele(integrated gasifieationConl一plant)见整体煤气化联合循环电厂。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条